My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-155R accepting financial assistance for the Taxiway Alpha Reconstruction Project at the San Marcos Regional Airport from the Texas Department of Transportation Aviation Division
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-155R accepting financial assistance for the Taxiway Alpha Reconstruction Project at the San Marcos Regional Airport from the Texas Department of Transportation Aviation Division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 2:59:47 PM
Creation date
10/12/2023 2:57:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Adopting
Number
2023-155
Date
10/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the State's agents,employees,or contractors from any and all expenses,including attorney <br /> fees which might be incurred by the State in litigation or otherwise resisting said claim <br /> or liabilities which might be imposed on the State as the result of such activities by the <br /> Sponsor, the Sponsor's agents or employees. <br /> 4. The Sponsor's acceptance of this Offer and ratification and adoption of the Agreement <br /> incorporated shall be evidenced by execution of this instrument by the Sponsor, as <br /> provided, and the Agreement shall comprise a contract, constituting the obligations and <br /> rights of the State of Texas and the Sponsor with respect to the accomplishment of the <br /> project and the operation and maintenance of the airport. Such Agreement shall become <br /> effective upon execution of this instrument and shall remain in full force and effect for a <br /> period of at least 20 years. <br /> 5. The Sponsor and not the State shall, for all purposes, be the "Sponsor" of the project <br /> identified above as defined in Title 49 U.S.C. Sponsor agrees to assume responsibility <br /> for operation of the facility in compliance with all applicable state and federal <br /> requirements including any statutes, rules, regulations, assurances, procedures, or any <br /> other directives before, during and after the completion of this project. <br /> 6. The Sponsor shall have on file with the State a current and approved Attorney's Certificate <br /> of Airport Property Interests and Exhibit A property map. <br /> 7. The Sponsor shall have on file with the State, Attachment C, Certification Regarding <br /> Drug-Free Workplace Requirements, attached and made a part of this agreement. <br /> 8. Unless otherwise approved by the State, the Sponsor will not acquire or permit any <br /> contractor or subcontractor to acquire any steel or manufactured products produced <br /> outside the United States to be used for any project for airport development or noise <br /> compatibility for which funds are provided under this grant. The sponsor will include in <br /> every contract a provision implementing this special condition. <br /> 9. Except for instrument landing systems acquired with AIP funds and later donated to and <br /> accepted by the FAA, the Sponsor must provide for the continuous operation and <br /> maintenance of any navigational aid funded under the AIP during the useful life of the <br /> equipment unless the equipment is transferred by agreement to the FAA in accordance <br /> with 49 U.S.C. § 44502(e); The sponsor must check the facility, including instrument <br /> landing systems,prior to commissioning to ensure it meets the operational standards. The <br /> Sponsor must also remove,relocate, or lower each obstruction on the approach or provide <br /> for the adequate lighting or marking of the obstruction if any aeronautical study <br /> conducted under FAR Part 77 determines that to be acceptable; and mark and light the <br /> runway, as appropriate. The Federal Aviation Administration will not take over the <br /> ownership, operation, or maintenance of any sponsor-acquired equipment, except for <br /> instrument landing systems. <br /> 10. For a project to replace or reconstruct pavement at the airport, the Sponsor shall <br /> implement an effective airport pavement maintenance management program as is <br /> required by Airport Sponsor Assurance Number 11. The sponsor shall use such program <br /> Page 10 of 44 V.9-1-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.