My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-155R accepting financial assistance for the Taxiway Alpha Reconstruction Project at the San Marcos Regional Airport from the Texas Department of Transportation Aviation Division
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-155R accepting financial assistance for the Taxiway Alpha Reconstruction Project at the San Marcos Regional Airport from the Texas Department of Transportation Aviation Division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 2:59:47 PM
Creation date
10/12/2023 2:57:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Adopting
Number
2023-155
Date
10/2/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I. Record Keeping.Complete information on the findings of all detailed inspections and <br /> on the maintenance performed must be recorded and kept on file for a minimum of <br /> five years.The type of distress,location,and remedial action,scheduled or performed, <br /> must be documented. The minimum information is: <br /> i. Inspection date; <br /> ii. Location; <br /> iii. Distress types; and <br /> iv. Maintenance scheduled or performed <br /> 2. Information Retrieval System, The Sponsor must be able to retrieve the information <br /> and records produced by the pavement survey to provide a report to the State as may be <br /> required. <br /> Page 21 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.