Laserfiche WebLink
11. Commissioning of MEP Systems. <br /> 12. Low voltage systems design as listed below. We will include rough-in conduit/boxes for <br /> these systems only,and coordinate with the owner's vendor as applicable. <br /> a. Telephone/data systems,including wireless access. <br /> b. Access control systems. <br /> c. Audio and video systems. <br /> d. Security systems—including CCTV. <br /> 13. Participation in preparation of Rebate Application(s). <br /> 14. Construction Cost estimating or other detailed cost estimating. <br /> 15. BIM Coordination models/drawings for contractor's use during construction. <br /> Insurance Requirements and Liability <br /> PKMR expects to enter into an AIA contract with the client on this project and the liability <br /> limitations and contractual provisions shall be addressed and agreed upon in that document. <br /> In the event client does not initiate a contract, PKMR will be working under the provisions <br /> outlined in the PKMR Consulting Services Terms and Condition document which is attached <br /> herein or can be obtained directly from PKMR. <br /> Warranties <br /> PKMR will provide services in a manner consistent with the level of care and skill ordinarily <br /> exercised by members of the profession currently practicing under similar conditions in the <br /> same locale. PKMR makes no warranties or guarantees, express or implied, relating to <br /> services and disclaims any implied warranties of merchantability and fitness for a particular <br /> purpose. <br /> Conclusion <br /> We appreciate the opportunity to work with you on this project and will be available to proceed <br /> as soon as we receive your authorization. <br /> Thank you. <br /> PKMR ENGINEERS <br /> J VOIq <br /> Mike Raaf, PE <br /> Principal <br /> PKMRENG.COM 3 <br />