My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-202R approving a Change in Service No. 2 to a professional design contract with Doucet & Associates for the provision of Rio Vista Drainage Improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-202R approving a Change in Service No. 2 to a professional design contract with Doucet & Associates for the provision of Rio Vista Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 4:29:26 PM
Creation date
1/9/2024 4:28:29 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-202
Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W <br /> D ® UCET <br /> A Kleinfelder company <br /> C) Environmental mitigation plans or permitting through Corps of Engineers or other State/Federal agency, if <br /> required, are not included in the scope of work. <br /> D) The amount of tree mitigation required per San Marcos' code will be shown on the plans, but tree <br /> replacement plans or mitigation services are not included. <br /> E) Meetings,other than the ones listed above, are not included. <br /> F) Change of Design requests from the City after Doucet has commenced with 90%design plan preparation my <br /> result in a loss of work and need to request additional services. <br /> Doucet proposes to perform the above services on a Time&Materials expended basis with a not-to-exceed budget <br /> of$79,957.50 unless further authorization is granted in writing from the City of San Marcos. We anticipate a schedule <br /> (upon receipt of authorization to proceed), as follows: <br /> Boundary,SUE, and additional facility survey work Six(6)weeks <br /> Preparation and submittal of 90%documents Six(6)weeks from survey completion <br /> Preparation of final submittal of 100%documents Four(4)weeks from receipt of 90%comments <br /> Bid phase assistance I Three (3)weeks from receipt of city permit <br /> If you have any questions regarding this proposal and the attachments, please feel free to contact us. We appreciate <br /> the opportunity to provide this proposal and look forward to working with you to complete this local flood mitigation <br /> project. <br /> Sincerely, <br /> Tom Curran, PE <br /> Senior Project Manager <br /> TBPE Firm#3937 <br /> TBPLS Firm#10194551 <br /> PAGE 1 6 October 13,2023 <br /> rio vista proposal 90 through CA 20231012.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.