My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-012 approving an agreement with Halff Associates, Inc. to provide on-call professional services related to Stormwater Master Plan update/development review and modeling assistance in the estimated amount of $950,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-012 approving an agreement with Halff Associates, Inc. to provide on-call professional services related to Stormwater Master Plan update/development review and modeling assistance in the estimated amount of $950,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 10:46:11 AM
Creation date
2/29/2024 2:19:15 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-12R
Date
2/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID:Al FOD76C-8E37-4295-AO8C-9A99498B56F7 <br /> 11 : <br /> haLff <br /> ■00000■ <br /> I nr7i l=;rrl I riy l r I(v(I 21� <br /> Ipid I e ,ir7('irl______ �u v7v mii m <br /> �u P ni Vw�, r'n uu n ti,vw W <br /> MO IN <br /> o TI B P V tl 7D — <br /> OPv Mu iii ;uwi 4u a uuy ��� <br /> i <br /> w <br /> ✓� a �� Hnur�,H�itiro�n, � � � � w rr <br /> e <br /> i" <br /> �r„ �li�,nV <br /> �(9 h Iln i ps Y GI 6wY <br /> ��� 8"�a Wd 7" d°i;�iu iGPJ wirVu u,r v uflu r¢ <br /> ,,,, <br /> 'roll <br /> iii. Aconcept uaIassess meInt HEC-RAS21D hydrauIicanalysiswiII be performed to determine local <br /> drainage patterns and flood risk within the airport based on the 25- and 100-year return <br /> events with Atlas 14 rainfall, 24-hour storm durations. The extents of the 2D hydraulic <br /> analysis of the airport will be as outlined in red in the figure below. This analysis will focus <br /> on existing condition overland flow utilizing LiDAR and breakline features. This assessment <br /> may include limited detention, culverts, or other drainage infrastructure of existing <br /> conditions. The conceptual assessment will evaluate existing condition runway and lot <br /> drainage.The initial flood risk areas will be further vetted in the next task. Halffshall obtain <br /> approval from the City Project Manager prior to beginning this analysis. <br /> 5 1 P <br />
The URL can be used to link to this page
Your browser does not support the video tag.