Laserfiche WebLink
DocuSign Envelope ID:Al FOD76C-8E37-4295-AO8C-9A99498B56F7 <br /> 11 : <br /> haLff <br /> ■00000■ <br /> .." / �{�', � a r✓'�,. � { �O r+a r //j�' �//� / lfl�J yaJi <br /> N <br /> II <br /> U <br /> 11 <br /> 7 <br /> Y1� / <br /> J! r <br /> ! <br /> I � <br /> li <br /> �, .,.u. e;"r'lJ��'`�Dl� /G7� �i��mYiry� "�✓,�Iww,,.. __! .,u.�l� °q,�,�oun_vaew^ma._, I.., w'r lyu. .a'u��",Jx, �2'G�y.;:. :,. U r <br /> b. Identify Stormwater Problems <br /> Halff will identify/confirm stormwater problem areas through coordination with the City and <br /> consideration of collected data such as existing stormwater infrastructure, known flood prone <br /> areas, and ongoing projects. Current hot spots will be identified through the following: <br /> i. Identify which local drainage and riverine issues listed in previous plans from Task2b.i have <br /> been or are proposed to be addressed with CIPS. Documents and visual aids forthe firstTask <br /> 1a.ii workshop will be developed to support coordination with the Cityand determination of <br /> remaining stormwater issues from previous efforts. <br /> ii. Identify new local drainage issues by reviewing the 2D rapid assessment from Task 3a.ii <br /> relative to collected data such as storm drain systems,street flooding, subdivision flooding, <br /> and drainage infrastructure. New hot spots will be confirmed with the City. <br /> iii. Assess airport areadrainage infrastructure where lots have been developed andwherethere <br /> are lots/open space available for future development through review of the airport <br /> assessment from Task 3a.iii. <br /> c. Hot Spot Database <br /> Halff will create a database to inventory up to fifty (50) hot spots.This will include data transfer <br /> of relevant existing information in the 2018 SWMP Field Assessment Form that the City desires <br /> to maintain as well as additional data supporting current hot spots from Task 3b. <br /> 6 11'' a gay <br />