Laserfiche WebLink
DocuSign Envelope ID:CE5FC79A-2819-445F-B9EC-5BF4EOA07FD6 <br /> EXHIBIT 1 <br /> CITY OF SAN MARCOS <br /> Shady, Valley, Gravel Utility Improvements Project <br /> SCOPE OF SERVICES <br /> Project Understanding <br /> The work to be performed by Pape-Dawson Engineers under this contract will consist of providing a <br /> Preliminary Engineering Design Report. The project consists of the following improvements: <br /> • General Description—the replacement and upsizing from 12-inch to 18-inch of up to <br /> approximately 3,200 linear feet of sanitary sewer line along the following roadways: <br /> o Martin Luther King Drive from Nance Street to Shady Lane(connection point at Nance <br /> and MLK) <br /> o Shady Lane from Martin Luther King Drive to Valley Street <br /> o Valley Street from Shady Lane to Jackman Street <br /> o Jackman Street from Valley Street to Gravel Street <br /> o Gravel Street from Jackman Street to Patton <br /> o Patton Street from Gravel Street to Eisenhower Street <br /> ■ Controlling elevation located at Eisenhower and Patton Street <br /> ■ Railroad Crossing at Patton Street and Storm Sewer Crossing at Jackman Street <br /> considered <br /> • Drainage Outfall that starts at MLK and Shady to be upsized. The storm sewer ultimately outfalls <br /> south of the Shady Lane and Valley Street Intersection. Full Phases of storm sewer to be <br /> analyzed to size the outfall line. <br /> • Stormwater Analysis that begins at the upstream end of the Moore Street drainage and Blanco <br /> Street Drainage and continues to the outfall at Purgatory Creek. The purpose of the study is to <br /> explore options to contain the 25-yr rainfall event in the proposed storm sewer network and <br /> contain the 100-yr rainfall in the right of way. The stormwater hydrology analysis will include <br /> the entire watershed for the following project phases: <br /> o Shady,Valley, Gravel Utility Improvements <br /> o Nance North Drainage Improvements <br /> o Old Ranch Road 12/Moore Street Reconstruction <br /> Basic Scope of Services <br /> Preliminary Engineering Report(PER) <br /> 1. Project Management and QA/QC: This task consists of effort associated with project administration, <br /> coordination with City staff, coordination and supervision of the project team, and quality <br /> management so that project milestones and deliverables meet schedule and budget constraints. <br /> 2. Meetings <br /> a. Project Coordination Meetings: Two (2) coordination meetings have been budgeted for <br /> the PER Phase. Pape-Dawson will attend meetings with City of San Marcos Staff to <br /> review conceptual and preliminary design schematics and to determine project <br /> constraints and needs as well as discuss design considerations. <br /> b. City Council Meetings: Up to three (3) City Council meeting has been budgeted which <br /> consists of preparing exhibits and attending the meeting. <br /> 3. Tasks: <br /> a. Develop a monthly status report, including a brief summary of work completed. <br /> 1 <br />