My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-128 approving an agreement with Plummer Associates, Inc., to provide on-call professional services for the Sunset Acres Subdivision drainage and associated improvements in the estimated amount of $3,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-128 approving an agreement with Plummer Associates, Inc., to provide on-call professional services for the Sunset Acres Subdivision drainage and associated improvements in the estimated amount of $3,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 10:00:33 PM
Creation date
7/22/2024 12:21:29 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-128
Date
7/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:21C696F2-FD37-4E21-94A2-C2BE6A22794A <br /> 6. Site Visits: Plummer shall conduct up to five (5) site visits for the purpose of becoming <br /> familiar with the project site and to aid in project design. <br /> Deliverables: <br /> 1. Phase 2 Design Survey: <br /> a. CAD file containing topographic surface and hard surface features <br /> b. Certification letter signed and sealed by RPLS. <br /> 2. Phase 2 Design Documents: <br /> a. 60% Plans <br /> b. 60%Technical Specifications <br /> C. 60%(Class 3) OPCC <br /> Task Order 5: Phase 2 90% Design <br /> 1. Update plans, specifications, and OPCC from Task Order 4 to 90%design per City review <br /> comments. <br /> 2. In addition to information provided in the 60% plans,the 90% plans submittal shall include <br /> and Erosion control plan. <br /> 3. In addition to addressing City's 60%OPCC comments, the 90%OPCC shall be updated from <br /> Class 3 to Class 1. <br /> 4. Plummer shall conduct up to five (5) site visits to aid in project design. <br /> Deliverables: <br /> 1. Phase 2 90% Plans. <br /> 2. Phase 2 90%Technical Specifications. <br /> 3. Phase 2 90% (Class 3) OPCC. <br /> 4. Phase 2 90%decision log, detailing City review comments and Plummer design decisions. <br /> Task Order 6: Phase 2 Final Design <br /> 1. Update plans, specifications, and OPCC from Task Order 5 to 99%design, per City 90% <br /> review comments. <br /> 2. Upon receipt of 99%design review comments from City, Plummer shall update and seal final <br /> deliverables. <br /> 3. Site Visits: Plummer shall conduct up to two (2) site visits to aid in project design. <br /> Deliverables: <br /> 1. 99% Design: <br /> a. 99% Plans. (PDF and CAD files per the City's GIs Submittal Checklist.) <br /> b. 99%Technical Specifications. <br /> C. 99%(Class 2) OPCC. <br /> d. 99%decision log, detailing City review comments and Plummer design decisions. <br /> Page 8 of 22 <br /> Documentl <br />
The URL can be used to link to this page
Your browser does not support the video tag.