My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-128 approving an agreement with Plummer Associates, Inc., to provide on-call professional services for the Sunset Acres Subdivision drainage and associated improvements in the estimated amount of $3,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-128 approving an agreement with Plummer Associates, Inc., to provide on-call professional services for the Sunset Acres Subdivision drainage and associated improvements in the estimated amount of $3,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 10:00:33 PM
Creation date
7/22/2024 12:21:29 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-128
Date
7/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:21C696F2-FD37-4E21-94A2-C2BE6A22794A <br /> 3. Phase 3 60%OPCC: <br /> 2. Prepare a Class 3 engineer's opinion of probable construction cost(OPCC)for <br /> the improvements listed above, using a Bid Schedule and bid items provided by <br /> the City and listed in their standard specifications, respectively. <br /> 4. Site Visits: Plummer shall conduct up to ten (10) site visits for the purpose of <br /> becoming familiar with the project site and to aid in project design. <br /> Deliverables: <br /> 1. Phase 3 Design Survey: <br /> a. Separate CAD files containing topographic surface and hard surface features. <br /> b. Certification letter signed and sealed by RPLS. <br /> 2. Phase 3 Survey of SMEU Improvements: <br /> a. CAD file containing the SMEU improvements. <br /> 3. Phase 3 Design Documents: <br /> a. 60% Plans <br /> b. 60%Technical Specifications <br /> C. 60%(Class 3) OPCC <br /> Task Order 15: Phase 3 90% Design <br /> 1. Update plans, specifications, and OPCC from Task Order 12 to 90%design per City review <br /> comments. <br /> 2. In addition to addressing City's 60% plan comments, 90% plans shall include: <br /> a. General Sheets: <br /> i. Estimates and Quantities Sheets (Up to Fifteen Total) <br /> b. Roadway Sheets: <br /> i. Roadway Interval Sections (600±section cuts anticipated, One Hundred-Fifty <br /> (150) Sheets Total) <br /> ii. Consists of sections every 50 LF and at driveways. <br /> iii. Drainage Sheets: <br /> 1. Hydrologic Calculations (Five Total) <br /> a. Calculations were previously approved by City in the PER and <br /> thus shall not be included in plan set. <br /> b. Rational Method and/or SCS Method calculations shall be <br /> included, showing drainage areas, values used for calculations, <br /> and results for each subbasin. <br /> iv. Wastewater Bypass Pumping Sheets (Six Total) <br /> v. Waterline Sheets: <br /> 1. Pipeline profile <br /> 2. Restrained pipe lengths <br /> 3. Connection details <br /> 3. In addition to addressing City's 60%OPCC comments, the 90%OPCC shall be updated from <br /> Class 3 to Class 1. <br /> 4. Site Visits: Plummer shall conduct up to five (5) site visits to aid in project design. <br /> Page 18 of 22 <br /> Documentl <br />
The URL can be used to link to this page
Your browser does not support the video tag.