Laserfiche WebLink
Docusign Envelope ID:ABD6B727-ADC4-4DAF-BFFF-C39FFC6E325C <br /> EXHIBIT 1 <br /> Subsurface Utility Exploration Services Unit Fee <br /> KCI Technologies, Inc. <br /> Professional Firm Name <br /> Level A-Vacuum Exploring <br /> 0'-5' Includes Equip&Labor for Vacuum Excavation,Survey&Backfill of test <br /> hole EA $1,300.00 <br /> 5-10' Includes Equip&Labor for Vacuum Excavation,Survey&Backfill of test <br /> hole EA $1,625.00 <br /> 10'-15' Includes Equip&Labor for Vacuum Excavation,Survey&Backfill of <br /> test hole EA $2,025.00 <br /> 15-20' Includes Equip&Labor for Vacuum Excavation,Survey&Backfill of <br /> test hole EA $2,600.00 <br /> >20' EA $247.00 <br /> Level B <br /> Utility Locating; Includes Equip&Labor for field designation,marking&Survey <br /> of toneable utilities including rodding,Inclusive of Level C&D LF $1.90 <br /> Level C <br /> Surveying of above ground appurtenances LF $0.85 <br /> Level D <br /> Records Research LF $0.75 <br /> Professional Services <br /> Principal HR $329.25 <br /> Project Manager HR $285.00 <br /> Sr.Project Engineer HR $242.46 <br /> Project Engineer HR $185.50 <br /> Engineer-in-Training(EIT) HR $134.50 <br /> Senior Engineer Tech HR $142.50 <br /> Engineer Tech HR $134.50 <br /> SUE Manager HR $185.00 <br /> SUE Field Manager HR $142.50 <br /> Senior RPLS HR $285.00 <br /> RPLS HR $235.00 <br /> Senior Survey Field Tech(SIT) HR $180.00 <br /> Potholing(Vacuum Excavation)(Q.L.A)(2 Man Crew)(Labor&Equip.) HR $442.00 <br /> Designating(Utility Locating)(1 Man Crew)(Labor&Equipment) HR $165.00 <br /> Designating(Utility Locating)(2 Man Crew)(Labor&Equipment) HR $227.00 <br /> 2-Man Surveying(Labor&Equipment) HR $227.00 <br /> 3-Man Surveying(Labor&Equipment) HR $265.00 <br />