Laserfiche WebLink
DEVELOPMENT PROCEDURES •%u <br /> 3. Street Network; and ARTICLE 6: WATERSHED PROTECTION PLANS <br /> 4. Special Requirements, if any. <br /> DIVISION 1: APPROVAL AND APPLICATION PROCESS <br /> Section 2.5.7.3Approval Process <br /> A. Responsible Official Action.The Responsible Official shall Section 2.6.1.1Purpose,Applicability, Exceptions and Effect <br /> approve, approve with conditions,or deny a regulating plan A. Purpose of a Watershed Protection Plan Phase 1 or Qualified <br /> based on the criteria in Section 2.5.6.4. Watershed Protection Plan Phase 1.The purpose of a <br /> Section 2.5.7.4Criteria for Approval watershed protection plan phase 1 or a qualified watershed <br /> protection plan phase 1 shall be to apply all Federal, State <br /> A. The following criteria shall be used to determine whether the and Local environmental and flood control standards to a <br /> application for a regulating plan shall be approved, conditionally conceptual development design by establishing terms and <br /> approved or denied: conditions for approval of development applications and <br /> entitlements. <br /> 1. The regulating plan is consistent with all applicable <br /> standards and requirements in Section 4.4.3.7, and any B. Purpose of a Watershed Protection Plan Phase 2 or Qualified <br /> prior approvals listed in Section 2.5.6.2; Watershed Protection Plan Phase 2. The purpose of a <br /> watershed protection plan phase 2 or a qualified watershed <br /> 2. The proposed provision and configuration of roads, protection plan phase 2 is to assure that the standards and <br /> electric,water,wastewater, drainage and park facilities conditions imposed under the conceptual development design <br /> conform to the Comprehensive Plan and any approved and any additional specific standards applicable to the approval <br /> City Master Plans or Capital Improvement Plans; of construction permits shall be met at the time of development <br /> 3. The proposed provision and configuration of roads, of the property. <br /> water,electric,wastewater, drainage and park facilities, C. General Applicability.A watershed protection plan or a <br /> and easements and rights-of-way are determined to be qualified watershed protection plan is required within the city <br /> adequate to serve each phase of the development in limits and within the city's extraterritorial jurisdiction. <br /> accordance with Section 3.5.1.1. <br /> D. Applicability of a Qualified Watershed Protection Plan 1 or 2. <br /> 4. The schedule of development is feasible and prudent, and A qualified watershed protection plan is required when any of <br /> assures that the proposed development shall progress to the following requests are made for developments greater than <br /> completion within the time limits proposed; and forty (40) acres: <br /> 5. The location, size and sequence of the phases of 1. A request for an increase in impervious cover requiring a <br /> development as required in Section 4.4.3.7 proposed mitigation plan; <br /> assures orderly and efficient development of the land <br /> subject to the regulating plan. 2. A request for reclamation of land in the 100-year floodplain <br /> or within a water quality zone or buffer zone;or <br /> Section 2.5.7.5Appeals <br /> 3. The development of twenty(20)acres or more of land <br /> The applicant or other interested person within the notification area within the 100-year floodplain. <br /> may appeal a decision on an application for approval of a regulating <br /> plan to the Planning and Zoning Commission in accordance with (Ord. No. 2020-60,9-1-2020) <br /> Section 2.8.1.1. E. Exceptions.A watershed protection plan or a qualified <br /> watershed protection plan is not required for: <br /> Amended:September 1, 2020. 2:39 <br />