My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 3:58:33 PM
Creation date
9/10/2024 3:40:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-246
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEVELOPMENT PROCEDURES •%u <br /> 3. Street Network; and ARTICLE 6: WATERSHED PROTECTION PLANS <br /> 4. Special Requirements, if any. <br /> DIVISION 1: APPROVAL AND APPLICATION PROCESS <br /> Section 2.5.7.3Approval Process <br /> A. Responsible Official Action.The Responsible Official shall Section 2.6.1.1Purpose,Applicability, Exceptions and Effect <br /> approve, approve with conditions,or deny a regulating plan A. Purpose of a Watershed Protection Plan Phase 1 or Qualified <br /> based on the criteria in Section 2.5.6.4. Watershed Protection Plan Phase 1.The purpose of a <br /> Section 2.5.7.4Criteria for Approval watershed protection plan phase 1 or a qualified watershed <br /> protection plan phase 1 shall be to apply all Federal, State <br /> A. The following criteria shall be used to determine whether the and Local environmental and flood control standards to a <br /> application for a regulating plan shall be approved, conditionally conceptual development design by establishing terms and <br /> approved or denied: conditions for approval of development applications and <br /> entitlements. <br /> 1. The regulating plan is consistent with all applicable <br /> standards and requirements in Section 4.4.3.7, and any B. Purpose of a Watershed Protection Plan Phase 2 or Qualified <br /> prior approvals listed in Section 2.5.6.2; Watershed Protection Plan Phase 2. The purpose of a <br /> watershed protection plan phase 2 or a qualified watershed <br /> 2. The proposed provision and configuration of roads, protection plan phase 2 is to assure that the standards and <br /> electric,water,wastewater, drainage and park facilities conditions imposed under the conceptual development design <br /> conform to the Comprehensive Plan and any approved and any additional specific standards applicable to the approval <br /> City Master Plans or Capital Improvement Plans; of construction permits shall be met at the time of development <br /> 3. The proposed provision and configuration of roads, of the property. <br /> water,electric,wastewater, drainage and park facilities, C. General Applicability.A watershed protection plan or a <br /> and easements and rights-of-way are determined to be qualified watershed protection plan is required within the city <br /> adequate to serve each phase of the development in limits and within the city's extraterritorial jurisdiction. <br /> accordance with Section 3.5.1.1. <br /> D. Applicability of a Qualified Watershed Protection Plan 1 or 2. <br /> 4. The schedule of development is feasible and prudent, and A qualified watershed protection plan is required when any of <br /> assures that the proposed development shall progress to the following requests are made for developments greater than <br /> completion within the time limits proposed; and forty (40) acres: <br /> 5. The location, size and sequence of the phases of 1. A request for an increase in impervious cover requiring a <br /> development as required in Section 4.4.3.7 proposed mitigation plan; <br /> assures orderly and efficient development of the land <br /> subject to the regulating plan. 2. A request for reclamation of land in the 100-year floodplain <br /> or within a water quality zone or buffer zone;or <br /> Section 2.5.7.5Appeals <br /> 3. The development of twenty(20)acres or more of land <br /> The applicant or other interested person within the notification area within the 100-year floodplain. <br /> may appeal a decision on an application for approval of a regulating <br /> plan to the Planning and Zoning Commission in accordance with (Ord. No. 2020-60,9-1-2020) <br /> Section 2.8.1.1. E. Exceptions.A watershed protection plan or a qualified <br /> watershed protection plan is not required for: <br /> Amended:September 1, 2020. 2:39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.