My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 3:58:33 PM
Creation date
9/10/2024 3:40:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-246
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-f - - - - - <br /> DEVELOPMENTACEDURES <br /> m , <br /> 1. Any land that is expressly exempted from the G. Modification of Previously Approved Plans.The property <br /> environmental standards contained in Chapter 6, of this owner shall submit a modified watershed protection plan <br /> Development Code. (phase 1 or phase 2, as applicable) or qualified watershed <br /> 2. The construction of a single family home where a plat is <br /> protection plan for approval where the following activities are <br /> proposed: . <br /> not required by Section 3.1.1.1. <br /> 1. Any change in the nature or character of the development <br /> F. Effect. from that covered by the approved plan, or any change <br /> 1. Approval of a watershed protection plan or a qualified that would significantly impact the ability of the approved <br /> watershed protection plan entitles the applicant to seek plan to preserve water quality; and <br /> approval of subsequent development applications. 2. Any development on land previously identified as <br /> 2. The approval or conditional approval of a watershed undeveloped in the approved plan. <br /> protection plan (phase 1 and phase 2) or qualified Section 2.6.1.2Application Requirements <br /> watershed protection plan shall constitute conditions of <br /> approval of any subordinate development applications A. Phased Plans.An application for a watershed protection plan <br /> for the land subject to such plan, and such development may be prepared and acted upon by the City in two phases. <br /> applications must be consistent with such plan. <br /> 1. A watershed protection plan (phase 1) shall be prepared <br /> 3. The following elements shall be incorporated within any prior to approval of a conceptual development plan and <br /> subordinate development application consistent with the prior to any development applications where no specific <br /> approved or conditionally approved watershed protection plan of development is portrayed. <br /> plan (phase 1 and phase 2) or qualified watershed <br /> protection plan: 2. A watershed protection plan (phase 2) shall be prepared <br /> prior to approval of the first development application that <br /> a. Demarcation of all water quality zones and buffer portrays a specific plan of development but at no time later <br /> zones for the property subject to the development than a development application or permit authorizing land <br /> application; disturbance including: <br /> b. Location of impervious cover allocated to the a. Final subdivision or development plat; <br /> property, including areas of intensified impervious <br /> cover, subject to the development application,or to be b. Minor subdivision plat or replat, if the land is located <br /> allocated among lots or tracts into which the property in any of the following areas: <br /> is to be divided; 1. Edwards Aquifer Recharge Zone,Transition Zone, <br /> c. For land in the Edwards Aquifer Recharge or and Contributing Zone within the Transition Zone; <br /> Transition Zones, identification of all sensitive features 2. A floodplain,water quality, or buffer zone; <br /> and demarcation of all sensitive feature protection <br /> zones for the property subject to the development 3. The San Marcos river protection zone; or <br /> application; <br /> 4. San Marcos river corridor. <br /> d. The contours of any land authorized for reclamation; <br /> c. Public improvement construction plan; or <br /> and <br /> e. The location of LID practices that replace impervious d. Site development permit. <br /> cover or mitigate water quality from runoff of <br /> impervious cover. <br /> 2:40 Amended: September 1, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.