My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 3:58:33 PM
Creation date
9/10/2024 3:40:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-246
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. An applicant may elect to submit a watershed protection 2. The Responsible Official may attach such conditions to <br /> plan (phase 2) in lieu of a watershed protection plan approval of a watershed protection plan phase 1 or 2 <br /> (phase 1). as are necessary to assure that the plan meets water <br /> quality standards, based on the recommendation of the <br /> 4. The watershed protection plan (phase 2) shall be Engineering Director, a qualified geologist, or a Texas- <br /> consistent with the watershed protection plan (phase 1). licensed professional engineer. <br /> (Ord. No. 2019-45, 12-17-19) B. Responsible Officials Action with regards to a Qualified <br /> B. An application for a phase 2 watershed protection plan or Watershed Protection Plan Phase 1 or 2 <br /> phase 2 qualified watershed protection plan requires proof of 1. The Responsible Official shall review the application and <br /> compliance with the City's flood prevention ordinance Chapter schedule an informative meeting with the Planning and <br /> 39, all federal regulations pertaining to the protection and Zoning Commission prior to providing approval. <br /> mitigation based on proposed modifications of a floodplain <br /> constituting wetlands or waters of the United States protected (Ord. No. 2020-60, 9-1-2020) <br /> under Section 404 of the Clean Water Act. <br /> Section 2.6.1.4Criteria for Approval <br /> C. An application for a watershed protection plan phase 1 or 2 <br /> or a qualified watershed protection plan shall be submitted The following criteria shall be used to determine whether the appli- <br /> in accordance with the universal application procedures in cation for a watershed protection plan or a qualified watershed pro- <br /> Section 2.3.1.1 except as otherwise provided in this Article 5. tection plan shall be approved, approved with conditions, or denied. <br /> D. A watershed protection plan or a qualified watershed protection A. Edwards Aquifer Zones- Factors.Where land subject to <br /> plan shall include all land contiguous to and in the same the plan lies in whole or in part within the Edwards Aquifer <br /> ownership with the land subject to the plat application or site recharge or transition zones: <br /> permit. 1. Whether the plan is consistent with approved legislative <br /> E. An application for a watershed protection plan phase 2 may be applications for the land subject to the plan; <br /> applied for and approved as an element of a comprehensive 2. Whether the plan meets the standards in Chapter 6 (except <br /> site permit or public improvement construction plan when the as to the components of a mitigation plan for a qualified <br /> land is not located in any of the following zones: watershed protection plan that vary from Chapter 6) and <br /> 1. Edwards Aquifer Recharge Zone; Chapter 3,Article 9; <br /> 2. A floodplain,water quality, or buffer zone; 3. Whether any proposed mitigation plan or enhanced <br /> geological assessment offsets the impacts to water quality <br /> 3. The San Marcos river protection zone;or resulting from increased development within a buffer zone; <br /> 4. San Marcos river corridor. 4. Whether any proposed increase of impervious cover is <br /> warranted beyond that otherwise allowed by right for the <br /> Section 2.6.1.3Approval Process land within the plan area; and <br /> A. Responsible Official Action.The Engineering Director is 5. Whether the plan is consistent with any proposed <br /> the Responsible Official for watershed protection plans and clustering or development transfers outside the plan area. <br /> qualified watershed protection plans. <br /> 1. The Responsible Official shall initially decide an application (Ord. No. 2020-60, 9-1-2020) <br /> for a watershed protection plan phase 1 or 2 based on the B. Other Water Quality Zones-Factors.Where land subject <br /> criteria in Section 2.6.1.4. to the plan lies in whole or in part within a floodplain, water <br /> Amended:Septgmber 1,2020 , f, ; , 11' j 2.41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.