My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2021
>
Res 2021-246 approving a Development Agreement with HK Baugh Ranch, LLC, HK Riley’s Pointe, LLC, and Benchmark Acquisitions, LLC, to regulate the annexation and future development of approximately 1,142 acres of land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 3:58:33 PM
Creation date
9/10/2024 3:40:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2021-246
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
714
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUBDIVISIONSC <br /> ;rIL <br /> - <br /> av <br /> the subdivision concept plat in accordance with Section B. An application for a preliminary subdivision or development <br /> 2.3.5.1. plat shall not be approved unless the following applications and <br /> development permits,where applicable, have been approved <br /> B. Extensions and remain in effect for the land included in the preliminary <br /> 1. The expiration date for any phase of the development may subdivision or development plat: <br /> be extended by the Planning and Zoning Commission 1. All legislative approvals needed to authorize the proposed <br /> under Section 2.3.5.1. Extension of the expiration date for uses for the land. <br /> the phase extends the expiration date for the subdivision <br /> concept plat for a like period. 2. A concept plat. <br /> 2. A subdivision concept plat is not subject to reinstatement 3. A regulating plan. <br /> following expiration. <br /> 4. A watershed protection plan (phase 1 or 2). <br /> DIVISION 2: PRELIMINARY SUBDIVISION OR DEVELOPMENT PLAT 5. A transportation impact assessment. <br /> Section 3.2.2.1 Purpose,Applicability, Exceptions and Effect Section 3.2.2.3Approval Process <br /> A. Purpose.The purpose of a preliminary subdivision or A. Responsible Official Action.The Responsible Official <br /> development plat shall be to determine the general layout of the shall review the application for a preliminary subdivision or <br /> subdivision,the adequacy of public facilities needed to serve development plat in accordance with the criteria in Section <br /> the intended development and the overall compliance of the 3.2.2.4 and provide a report and recommendation to the <br /> land division with applicable requirements of this Development Planning and Zoning Commission. <br /> Code. <br /> B. Planning and Zoning Commission Action.The Planning and <br /> B. Applicability.A preliminary subdivision or development plat is Zoning Commission shall decide whether to approve, approve <br /> required for developments where: with conditions,or statutorily deny the preliminary subdivision <br /> or development plat application.The action of the Commission <br /> 1. Public infrastructure is required and the developer has shall be noted and the reasons for the action shall be entered in <br /> elected not to file a subdivision improvement agreement. the minutes of the Commission. <br /> C. Effect.Approval of a preliminary subdivision or development Section 3.2.2.4Criteria for Approval <br /> plat shall authorize the installation of public improvements <br /> upon approval of public improvement construction plans under A. Criteria.The following criteria shall be used to determine <br /> Section 3.4.1.1. whether the application for a preliminary subdivision plat or <br /> development plat shall be approved,approved with conditions, <br /> D. Approval of a preliminary subdivision or development plat or denied: <br /> shall also authorize the subdivider to seek approval of a <br /> final subdivision or development plat for the land subject to 1. If no subdivision concept plat has been approved the <br /> acceptance of the public infrastructure. criteria in Section 3.2.1.4 shall apply; <br /> Section 3.2.2.2Application Requirements 2. The plat conforms to all prior approvals or phasing plans <br /> A. An application for a preliminary subdivision or development plat for the development; <br /> shall be submitted in accordance with the universal application 3. The proposed provision and configuration of roads,water, <br /> procedures in Section 2.3.1.1. except as otherwise provided in wastewater,drainage and park facilities, and easements <br /> this Chapter 3. and rights-of-way are adequate to serve the subdivision <br /> and meet applicable standards of this Development Code; <br /> and <br /> 3:8 San Marcos Development Code Amended: September 1, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.