Laserfiche WebLink
Docusign Envelope ID:6235D262-566F-44E2-97FE-4F655390BCEC <br /> Garver will prepare initial exhibits showing the potential locations and identifying the pros and cons of <br /> each site. The exhibits will be presented to the City and TAP in a virtual meeting. The meeting is <br /> expected to be two (2) hours and will be attended by one (1) Garver staff member. The intended result <br /> of the meeting is to identify a preferred terminal complex location before proceeding with Task 3.3. <br /> Task 3.3— Roadway Alternatives/Analysis <br /> Garver will prepare three (3) roadway alignment alternatives defining how the existing and proposed <br /> future roadway infrastructure will connect to the preferred terminal location. Data from the previous <br /> 2020 traffic study will be used to develop existing 2023 traffic volumes. Additionally, traffic generated <br /> by high and low growth aircraft traffic scenarios discussed in Task 1.2 will be developed. Each <br /> roadway alternative will be analyzed related to cost and traffic implementations. The traffic <br /> evaluation will include operational analysis for the AM and PM peak hours using Synchro software. <br /> Garver will prepare initial exhibits showing the potential layouts and identifying the pros and cons of <br /> each roadway layout. The exhibits will be presented to the City and TAP in a virtual meeting. The <br /> meeting is expected to be two (2) hours and will be attended by two(2) Garver personnel. The intended <br /> result of the meeting is to identify a preferred roadway concept. <br /> Task 3.4— Fuel Farm, Electrical Vault, and ATCT Alternatives <br /> Garver will analyze up to two (2) potential locations for the fuel farm, electrical vault, and ATCT at the <br /> Airport. <br /> The proposed locations for the fuel farm will be based on the following information: <br /> • Environmental considerations (e.g., wetlands, floodplains, landfills, etc.) <br /> • Roadway access (existing and future) <br /> • Proximity to preferred terminal location <br /> • Proposed future development impacts <br /> • Airspace considerations (14 CFR Part 77 surfaces) <br /> • Utility locations <br /> • NAVAID Critical Areas <br /> The proposed locations for the electrical vault will be based on: <br /> • Environmental considerations (e.g., wetlands, floodplains, landfills, etc.) <br /> • Proximity to existing electrical systems and power supply <br /> • Proposed future development impacts <br /> • Airspace considerations (14 CFR Part 77 surfaces) <br /> • NAVAID Critical Areas <br /> The proposed locations for the ATCT will be based on: <br /> • Environmental considerations (e.g., wetlands, floodplains, landfills, etc.) <br /> • Proximity to existing electrical systems and power supply <br /> • Proposed future development impacts <br /> • Airspace considerations (14 CFR Part 77 surfaces) <br /> Garver will prepare initial exhibits showing the potential locations and identifying the pros and cons of <br /> each site. The exhibits will be presented to the City and TAP in a virtual meeting. The meeting is <br /> Appendix A- Scope of Services 4 of 7 <br /> HYI —Airport Master Plan Update Garver Project No. 2302305 <br />