My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-111 approving an agreement with Garver, LLC, for services to update the San Marcos Regional Airport Master Plan in the estimated amount of $171,463.50
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-111 approving an agreement with Garver, LLC, for services to update the San Marcos Regional Airport Master Plan in the estimated amount of $171,463.50
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 10:13:26 PM
Creation date
10/8/2024 10:06:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-1111
Date
7/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:6235D262-566F-44E2-97FE-4F655390BCEC <br /> expected to be one (1) hour and will be attended by two (2) Garver personnel. The intended result of <br /> the meeting is to identify a preferred fuel farm and electrical vault location before proceeding with Task <br /> 3.5. <br /> Task 3.5— Updated Alternatives Report <br /> Based on the results of Task 3.1 through 3.4, Garver will prepare an addendum to the 2021 Alternatives <br /> Chapter of the HYI Airport Master Plan. The addendum will be in the form of a memorandum that will <br /> be attached as an appendix to the original chapter. The addendum is expected to be approximately <br /> twenty-five (25) to thirty (30) pages. This will also include the development of a new composite <br /> preferred development alternative for the Airport based on the results of the preceding project elements <br /> and the results of the HYI Gap Analysis project completed in 2023. <br /> Additionally, a two (2) hour virtual meeting will also be conducted with TxDOT Aviation to review the <br /> updated to the preferred alternative. <br /> Task 3.6— Public Open House <br /> Based on the results of Task 3.1 through 3.4, Garver will complete a public open house at the Airport. <br /> The intent of the public open house is to provide the public with an opportunity to review the draft <br /> alternatives and provide feedback on the proposed development plan. Garver will prepare display <br /> board (6 boards are assumed)showing the proposed development concepts for use at the public open <br /> house. The open house will be conducted in a single two (2) hour period and will be attended by two <br /> (2) Garver personnel. The open house will be conducted in a manner to allow participants to come- <br /> and-go as desired. A formal presentation will not be provided. <br /> ELEMENT 4—CIP AND FINANCIAL PLAN <br /> Task 4.1 — Prepare an Updated CIP/Financial Plan Chapter <br /> Garver will prepare an updated version of the CIP/Financial Plan Chapter based on the results of the <br /> preceeding project elements and the results of the HYI Gap Analysis and Pavement Analysis project <br /> completed in 2023/2024. Planning level cost estimates will be prepared for any projects not contained <br /> in either one of the aformentioned studies. Additionally, this CIP will include cost estimates related to <br /> taxilane rehabilitation on the existing main apron and security improvements to the existing fence line. <br /> Cost estimates from the previous studies (the 2021 AMP and the HYI Gap Analysis study) will be <br /> updated to reflect current year costs. All cost estimates will be planning level cost estimates that should <br /> be used for planning purposes only. <br /> An updated financial plan will be prepared that describes the proposed funding mechanisms to be used <br /> for each project. This task includes up to three (3) in-person or virtual meetings with City and TAP staff <br /> to formulate and revise the proposed CIP and Financial Plan. Each meeting is assumed to be up to <br /> two (2) hours. Additionally, a two (2) hour in-person meeting will also be conducted with TxDOT <br /> Aviation to review the updated CIP. <br /> Garver will prepare a new CIP/Financial Plan Chapter for the AMP. The new chapter is expected to be <br /> approximately twenty-five(25)to thirty(30) pages. This will also include the development of a near/mid- <br /> term (next 10 years) CIP graphic and a long-term CIP graphic. <br /> Appendix A- Scope of Services 5 of 7 <br /> HYI —Airport Master Plan Update Garver Project No. 2302305 <br />
The URL can be used to link to this page
Your browser does not support the video tag.