My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:47:57 PM
Creation date
11/3/2024 10:39:36 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-193
Date
10/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BOCECOFB-76E6-4AA8-BDA4-ED2B9C3F4C27 <br /> 13620 Briarwick Dr, Suite 100 <br /> ■�II�II�II�I■11111111illim ha <br /> �,� Austin,Texas 78729 <br /> M E N Phone(512)777-4600 <br /> -4600 <br /> EXHIBIT 'A' <br /> SCOPE OF SERVICES <br /> San Marcos Quail Creek Preliminary Design Report <br /> CITY of San Marcos <br /> The purpose of the services proposed herein is to provide professional consulting services consisting of <br /> landscape architecture, civil engineering, hydrology/hydraulics, and other services necessary for the <br /> development of the San Marcos Quail Creek Preliminary Design Report (the project). <br /> This proposal assumes that some of the community engagement and presentations (the second open <br /> house, parks board and city council meetings/presentations) will be conducted in conjunction with the <br /> Riverfront Parks project. The fee for those meetings/presentations in this proposal only accounts for time <br /> needed to prepare additional boards and presentation material as it relates to Quail Creek. All time spent <br /> at the meetings and presentations is accounted for within the existing Riverfront Parks contract. <br /> GENERAL SCOPE <br /> Halff Associates, Inc. (Consultant) is proposing services to provide professional Master Planning and <br /> preliminary design services perceived as necessary for the development of the Quail Creek property for <br /> the City of San Marcos,Texas. Improvements are anticipated to be limited to within the area shown in <br /> the exhibit below. CONSULTANT services will consist of master planning, analysis and design for <br /> preparation of a Preliminary Design Report (PDR) for the project limits. <br /> Proposed project limits <br /> �F <br /> i <br /> i <br /> :r <br /> PROJECT UNDERSTANDING <br /> A Preliminary Design Report(PDR)will be prepared that will identify and address critical site and design <br /> elements.The PDR will include the following: <br /> SAN MARCOS QUAIL CREEK PRELIMINARY DESIGN REPORT PAGE 2 <br /> SCOPE OF SERVICES September 4,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.