My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:47:57 PM
Creation date
11/3/2024 10:39:36 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-193
Date
10/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BOCECOFB-76E6-4AA8-BDA4-ED2B9C3F4C27 <br /> 13620 Briarwick Dr, Suite 100 <br /> ■�II�II�II�I■1111111111illim ha <br /> �,� Austin,Texas 78729 <br /> M E N Phone(512)777-4600 <br /> -4600 <br /> Phase 11 Preliminary Design Report 'D' <br /> 3.01 Develop draft Preliminary Design Report <br /> a) CONSULTANT to develop report template and draft of PDR. Report document is to be <br /> stylized and contain the illustrative exhibits described and developed above. <br /> b) CONSULTANT will then draft applicable sections of the PDR for issuance to the City. <br /> c) Write ups of the PDR to include impacts to the site including Right of Way, <br /> determination of sufficient water/wastewater capacity, floodplain and hydrological <br /> impacts, future roadway and intersection layouts, and public engagement summary. <br /> 3.02 Review draft report with CITY staff <br /> a) One (1) round of CITY comments will provide CONSULTANT with direction/feedback. <br /> 3.03 Finalize report and deliver to CITY <br /> a) CONSULTANT will revise applicable sections of the PDR for issuance to the City. <br /> b) This task includes producing a summary report of existing conditions/analysis with an <br /> associated overall cost and executive summary to assist the CITY with programming and <br /> implementing proposed improvements. <br /> c) CONSULTANT team will conduct a formal QA/QC of the final drafted PDR prior to <br /> distribution to client. <br /> 3.04 Attend two (2) Parks Board Meetings, as required,for adoption of PDR. <br /> 3.05 Attend one (1) City Council Workshop, as required,for adoption of PDR. <br /> 3.06 Attend one (1) City Council Meeting, as required,for adoption of PDR. <br /> EXCLUSIONS ( ADDITIONAL SERVICES <br /> The following services are not included within the scope of basic services unless previously discussed <br /> above. Should CONSULTANT be required to provide services in obtaining or coordinating compilation of <br /> this information, such services shall be performed as Additional Services. Additional Services shall only <br /> be provided if previously authorized by the CITY. <br /> Additional Services may include, but not be limited to, the following: <br /> • Evaluation of existing park property floodplain based on Atlas 14 rain fall values <br /> • Public stakeholder meetings and/or other presentations/facilitation beyond those described in <br /> scope of services <br /> • Preparation of construction documents, regulatory entitlement, bidding assistance and construction <br /> phase services related to any defined phases of the project <br /> • Design Survey <br /> • Subsurface Utility Consulting <br /> • Geotechnical Services <br /> • Materials Testing <br /> • Any design work that will require work in the ROW or impact traffic entering and exiting the public <br /> and private ROW not accounted for in basic scope of services <br /> • Traffic Impact Analysis <br /> • Detailed cost estimating services or independent cost estimating by a third party <br /> • Services required after final acceptance of final work product <br /> SAN MARCOS QUAIL CREEK PRELIMINARY DESIGN REPORT PAGE 7 <br /> SCOPE OF SERVICES September 4,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.