My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-193 approving an agreement with Halff Associates, Inc., for professional services associated with development of the Quail Creek Preliminary Design Report for the former Quail Creek Country Club property located at 2701 Airport Highway 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 4:47:57 PM
Creation date
11/3/2024 10:39:36 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-193
Date
10/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BOCECOFB-76E6-4AA8-BDA4-ED2B9C3F4C27 <br /> 13620 Briarwick Dr, Suite 100 <br /> ■�II�II�II�I■11111111illim ha <br /> �,� Austin,Texas 78729 <br /> M E N Phone(512)777-4600 <br /> -4600 <br /> b) CONSULTANT will ensure all drive isle widths and internal radii adhere to City of San <br /> Marcos development standards, include City Fire requirements. <br /> c) CONSULTANT will prepare three(3)conceptual layout plans for the proposed park project. <br /> 2.07 Erosion and Sediment Control <br /> a) CONSULTANT will identify locations of water quality facilities for the proposed <br /> improvements as determined by the landscape architect. <br /> b) Formal design, lengths, and details for the water quality facilities is not included in <br /> this scope of services. Design of such measures is anticipated to occur during formal <br /> construction plan preparation. <br /> 2.08 Opinion of Probable Construction Cost(OPCC) <br /> a) Produce one(1)overall OPCC broken down by Master Plan Graphic Enlargement area <br /> (three in total). One(1)set of CITY comments for the OPCC will provide CONSULTANT with <br /> direction/feedback.All onsite impervious cover included roadways, parking facilities, site <br /> utilities,grading, erosions and sedimentary controls, pedestrian facilities,signage and future <br /> design soft costs. <br /> 2.09 Public Open House Meeting(Follow-Up) <br /> a) Conduct a second,weekday evening open house for direct feedback on the draft master <br /> plan and park program. Consultant shall be responsible for printing and bringing master <br /> plan concepts, photos, and all items necessary to convey the plan at the open house. <br /> The City will be responsible for public outreach and development of all material to <br /> advertise the open house and collecting feedback. All social media, digital and mail <br /> information and distributed items will the responsibility of the City to generate and <br /> maintain. <br /> b) The location for the public open house meeting will be determined and identified by <br /> CITY staff.The open house will be held in the evening after business hours. (One, <br /> weekday evening meeting for 3 hours maximum). <br /> Provide the raw results of the online community survey to CITY staff along with one (1) digital summary <br /> of survey results and analysis.The materials needed for the open house will be discussed with <br /> CONSULTANT and CITY before the public open house. CONSULTANT will prepare interactive paper or <br /> board mounted displays, meeting signs, and sign in sheets as appropriate, and will be responsible for <br /> setting up displays for the meeting. Additionally, CONSULTANT will develop a summary of feedback <br /> comments received during the meeting and associated priorities generated by the citizen feedback and <br /> will incorporate these findings into the final PDR document. <br /> SAN MARCOS QUAIL CREEK PRELIMINARY DESIGN REPORT PAGE 6 <br /> SCOPE OF SERVICES September 4,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.