Laserfiche WebLink
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> WALLACE ADDITION SUBDIVISION IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> g. Utility Coordination: The Consultant will develop a Utility Conflict Matrix and Layout Plans <br /> showing existing utility conflicts with proposed solutions. <br /> h. Tree Mitigation: The Consultant will develop Tree Preservation Plan and Details <br /> (estimated at 3 sheets total). A tree survey and tree table will be required. Existing trees <br /> to be removed and preserved will be identified on the sheets. Proposed trees, <br /> landscaping, and irrigation plans will be required. <br /> i. Erosion/Sedimentation Control: The Consultant will develop erosion and sedimentation <br /> control measures to be included in the plans and details. <br /> j. Traffic Control: The Consultant will provide standard traffic control details for construction <br /> of the improvements. A detailed traffic control plan will be developed for all major streets <br /> within the project area. <br /> k. Sequence of Construction: The Consultant will analyze the construction sequence with <br /> the City to identify a work plan that would minimize the construction schedule as well as <br /> minimize disruption to the public. <br /> I. Geographic Information System (GIS) Submittal: The Consultant will prepare and submit <br /> a GIS submittal as per the Plan Review Checklist and the GIS Review Checklist at the <br /> 60%, 90%, 99%, and 100% Phases. <br /> m. Permitting: The Consultant will prepare a list of all permits required for the project to <br /> include: <br /> • Texas Commission on Environmental Quality (TCEQ) Storm Water Permit <br /> • City of San Marcos Permits. <br /> n. Cost Estimates: The Consultant will update the OPCC with the 60%, 90%, 99%, and <br /> 100% deliverable. The OPCC will conform to AACE standards for each deliverable <br /> required during the design phase. <br /> o. Texas Department of Licensing & Regulation (TDLR) Review: The Consultant will <br /> perform a TDLR review for compliance with Chapter 469 of the Texas Government Code, <br /> State of Texas Architectural Barriers Act, and TDLR Administrative Rule 68.102 at the <br /> 90% design phase. The Consultant proposes to use Altura Solutions to perform the <br /> project registration with TDLR, perform the plan review, and inspection for compliance <br /> with the State of Texas Architectural Barriers Act. The Public Rights-of-Way Accessibility <br /> Guidelines (PROWAG) will be used as the standard to achieve compliance for all work <br /> located within the Public Right-of-Way. Results of TDLR review will be incorporated into <br /> the 99% design submittal. <br /> p. Prepare Promoting Resilient Operations for Transformative, Efficient, and Cost-Savings <br /> Transportation (PROTECT) grant for the Wallace Addition Subdivision: The Consultants <br /> will assist the City in the preparation of a PROTECT Grant application for Wallace <br /> Addition. The Consultant will prepare the following sections of the grant application: <br /> i. Project Description <br /> ii. Project Location <br /> iii. Project Parties <br /> iv. Grant Funds, Sources, and Uses of all Project Funding <br /> V. Merit Criteria <br /> 6 <br />