My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> WALLACE ADDITION SUBDIVISION IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> vi. Criterion 1 -Vulnerability and Risk <br /> vii. Criterion 2 - Criticality to Community <br /> viii. Criterion 3 - Design Elements <br /> ix. Criterion 4 - Public Engagement, Partnership, and Collaboration <br /> X. Criterion 5 - Equity and Justice40 <br /> xi. Criterion 6 - Climate Change Sustainability <br /> xii. Criterion 7 Schedule and Budget <br /> xiii. Criterion 8— Innovation <br /> xiv. Benefit-Cost Analysis <br /> xv. Federal Highway Administration Priority Considerations <br /> xvi. Equity and Justice40 <br /> xvii. Workforce Development, Job Quality, and Wealth Creation <br /> xviii. Construction Readiness <br /> xix. Funding Needs <br /> xx. Appendices <br /> D. Deliverables: <br /> a. Monthly Status Report: The Consultant will provide a monthly status report, including a <br /> summary of work completed with an MS Project schedule updated to reflect milestone <br /> deliverables. <br /> b. 60% Design Phase: Consultant will provide two (2) hard copies of 11"x 17" plan sets and <br /> one (1) pdf electronic copy. It is estimated that the plan set will contain the following: <br /> • Cover Sheet: Estimated Number of Sheets—one (1). <br /> • General Notes Sheet: Estimated Number of Sheets—one (1) <br /> • Quantity Sheet: Consultant will provide a quantity table that includes individual <br /> sheet quantities and the overall project quantities. Estimated Number of Sheets <br /> —one (1) <br /> • Project Layout& Survey Sheet: Consultant will provide a layout of the project <br /> with plan sheet references. Estimated Number of Sheets (2). <br /> • Typical Cross-Section Sheets: Estimated Number of Sheets—two (2). <br /> • Tree Mitigation & Preservation Sheets (if required or shown on erosion and <br /> sedimentation controls sheet, to include tree table and survey, tree removal and <br /> installation plan with irrigation)— Estimated Number of Sheets—four(4). <br /> • Erosion & Sedimentation Controls- Estimated Number of Sheets—two (2). <br /> • Construction Phasing (Traffic Control Narrative) Sheets: Estimated Number of <br /> Sheets—three (3). <br /> • Traffic Control Plan (Detailed Version): Estimated Number of Sheets-three (3). <br /> • Removal Plan (if required): Estimated Number of Sheets—two (2). <br /> • Streets, Driveways, and Sidewalks Plan and Profile Sheets: Estimated Number <br /> of Sheets—fifteen (15). <br /> • Grading Plans for Intersections: Estimated Number of Sheets—ten (10). <br /> • Pavement Markings & Signage Plans: Estimated Number of Sheets—fifteen <br /> (15). <br /> • Drainage Improvements Plan and Profile Sheets: Estimated Number of Sheets— <br /> eight (8). <br /> • Structural Sheets (if needed): Estimated Number of Sheets two (2). <br /> • Retaining Walls (if needed): Estimated Number of Sheets—two (2). <br /> • Sanitary Sewer Main Pipeline Plan and Profile Sheets: Estimated Number of <br /> Sheet—twenty (20). <br /> • Sanitary Sewer Bypass Plans: Estimated Number of Sheets—ten (10). <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.