Laserfiche WebLink
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> WALLACE ADDITION SUBDIVISION IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> • Potable Water Pipeline Plan and Profile Sheets: Estimated Number of Sheets— <br /> twenty-two (22). <br /> • Utility Conflict Matrix and Layout Plans: Estimated number of Sheets—four (4). <br /> • Storm Water Pollution and Prevention Plan (SW3P): Estimated Number of <br /> Sheets -eight (8). <br /> • Cross Sections Sheet: Estimated number of Sheets—ten (10) <br /> • List of Standard Details: City of San Marcos details will be used. <br /> • Geographic Information System (GIS) Submittal: As per Plan Review Checklist. <br /> • Hydrologic Calculations and Drainage Area Map. <br /> • List of Standard Specifications: City of San Marcos Division 1 specifications will <br /> be used. City of Austin standard specifications will be used. <br /> • Engineer's Opinion of Probable Construction Costs (OPCC)—Class 2 Standard. <br /> • Construction Project Schedule: Consultant will develop a Construction Schedule <br /> for the project consisting of design, bid and construction phases. The schedule <br /> will be updated during subsequent design phases. <br /> c. 60% Comment Response Letter. After 60% deliverable review, the Consultant will <br /> document all City review comments and document how each comment was addressed <br /> and incorporated into the 90% deliverable. <br /> d. 90% Design Phase: Consultant will provide two (2) hard copies of 11"x 17" plan sets and <br /> one (1) pdf electronic copy. The plan set will also contain the following: <br /> • Cover Sheet: Estimated Number of Sheets—one (1). <br /> • General Notes Sheet: Estimated Number of Sheets—one (1) <br /> • Quantity Sheet: Consultant will provide a quantity table that includes individual <br /> sheet quantities and the overall project quantities. Estimated Number of Sheets <br /> —one (1) <br /> • Project Layout& Survey Sheet: Consultant will provide a layout of the project <br /> with plan sheet references. Estimated Number of Sheets (2). <br /> • Typical Cross-Section Sheets: Estimated Number of Sheets—two (2). <br /> • Tree Mitigation & Preservation Sheets (if required or shown on erosion and <br /> sedimentation controls sheet, to include tree table and survey, tree removal and <br /> installation plan with irrigation)— Estimated Number of Sheets—four(4). <br /> • Erosion & Sedimentation Controls- Estimated Number of Sheets—two (2). <br /> • Construction Phasing (Traffic Control Narrative) Sheets: Estimated Number of <br /> Sheets—three (3). <br /> • Traffic Control Plan (Detailed Version): Estimated Number of Sheets-three (3). <br /> • Removal Plan (if required): Estimated Number of Sheets—two (2). <br /> • Streets, Driveways, and Sidewalks Plan and Profile Sheets: Estimated Number <br /> of Sheets—fifteen (15). <br /> • Grading Plans for Intersections: Estimated Number of Sheets—ten (10). <br /> • Pavement Markings & Signage Plans: Estimated Number of Sheets—fifteen <br /> (15). <br /> • Drainage Improvements Plan and Profile Sheets: Estimated Number of Sheets— <br /> eight (8). <br /> • Structural Sheets (if needed): Estimated Number of Sheets two (2). <br /> • Retaining Walls (if needed): Estimated Number of Sheets—two (2). <br /> • Sanitary Sewer Main Pipeline Plan and Profile Sheets: Estimated Number of <br /> Sheet—twenty (20). <br /> • Sanitary Sewer Bypass Plans: Estimated Number of Sheets—ten (10). <br /> • Potable Water Pipeline Plan and Profile Sheets: Estimated Number of Sheets— <br /> twenty-two (22). <br /> 8 <br />