Laserfiche WebLink
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> WALLACE ADDITION SUBDIVISION IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> 12. Additional services to be determined at the time of request (fee to be determined at the time of <br /> request). <br /> COMPENSATION FOR PROFESSIONAL SERVICES: <br /> The fees for the above services shall be allocated on a time and materials basis according to the <br /> following phases: <br /> Phase Amount <br /> Preliminary Engineering $ 280,230 <br /> Design Phase (60%) $ 440,450 <br /> Design Phase (90%) $ 216,860 <br /> Design Phase (99%) $ 93,325 <br /> Design Phase (100%) $ 54,520 <br /> Bid Phase $ 42,700 <br /> Construction Phase $ 248,783 <br /> Record Drawings $ 22,720 <br /> Additional Supplemental Services (Fee to be determined at time of request) $ 317,045 <br /> Subconsultants <br /> HVJ (Geotechnical) $ 46,013 <br /> McGray and McGray (Surveying) $ 149,854 <br /> Rios-Group (SUE) $ 82,742 <br /> Altura (TDLR) $ 4,758 <br /> TOTAL FEE $2,000,000 <br /> 15 <br />