My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> Mr.Jaime R. Kypuros,Jr.,PE <br /> City of San Marcos Wallace Subdivision <br /> August 13,2024 <br /> SGT 24 1041 <br /> the cohesive soils and Standard Penetration Tests (SPT) in cohesionless soils. Continuous <br /> rock coring is not included in our scope of work. <br /> Groundwater data will be obtained during and immediately after drilling,if encountered. <br /> Upon completion of drilling and groundwater readings, boreholes will be backfilled using <br /> soil cuttings and bentonite pellets to match existing grade, and patch with asphalt. <br /> Dynamic Cone Penetration (DCP) tests will be performed on subgrade at four (4) select <br /> boring locations. <br /> • Laboratory Tests: Laboratory index tests will be performed on select soil samples recovered <br /> from the test borings. The index tests will include Atterberg limits, percent passing no. 200 <br /> sieve, moisture content, unconfined compressive strength and corrosivity (pH, Sulfate, <br /> Chloride, Resistivity) tests. <br /> The collected field and laboratory data will be interpreted and used to develop geotechnical <br /> investigation report for the project. The report will include the following specific items: <br /> • Site vicinity map, <br /> • Geology map, <br /> • Plan of borings, <br /> • Boring logs, <br /> • Field and Laboratory test results summary, <br /> • Recommendations for open-cut installation of the utility lines, <br /> • Trench safety recommendations, <br /> • Pipe bedding and backfill recommendations, and <br /> • General discussion of construction and excavation recommendations. <br /> The above-described report will be prepared by an engineer specializing in soil mechanics after <br /> reviewing available boring and laboratory data. <br /> Pavement Design Scope <br /> HVJSCTx will prepare pavement designs for this project in accordance with the City of San Marcos <br /> guidelines using geotechnical data. Falling Weight Deflectometer (FWD) tests will be performed <br /> along the residential streets to evaluate full depth reconstruction and rehabilitation requirements. <br /> We understand the City of San Marcos will provide available traffic data for the pavement design. <br /> Because the current conditions and unknown historical pavement materials along the existing roads, <br /> HVJSCTx proposes to utilize nondestructive deflection testing (NDT) with the Falling Weight <br /> Deflectometer (FWD) to calculate subgrade design parameters. The data may also be used to finalize <br /> boring locations to be able to collect representative geotechnical data concerning existing pavement <br /> layer thicknesses, base layers, and in-situ subgrade conditions identified in deflection profile plots <br /> using the NDT data. <br /> We will submit a signed and sealed pavement design report Tetra Tech. The pavement design report <br /> must be reviewed and approved by the City of San Marcos prior to its implementation. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.