Laserfiche WebLink
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> Mr.Jaime R. Kypuros,Jr.,PE <br /> City of San Marcos Wallace Subdivision <br /> August 13,2024 <br /> SGT 24 1041 <br /> pavement design report will document assumptions and design considerations. The pavement design <br /> report will include the following: <br /> • Cover sheet with roadway name,geographical limits, and signatures of persons involved in <br /> the preparation and approval. <br /> • Existing and proposed typical sections. <br /> • Soils map of the project area with a brief description of each type of soil located within the <br /> project areas. <br /> • Design input values and output. <br /> • Conclusion consisting of recommended pavement design or designs based on the data, <br /> analyses, and procedures included in the report. <br /> • Pavement design details specified for each location that includes structural layer materials, <br /> general specifications, and layer thicknesses. <br /> • Relevant pavement evaluation data (structural and functional) and condition information on <br /> adjacent roads. <br /> • Site conditions that might influence the design and performance of pavements. <br /> • Relevant geotechnical data including boring logs,laboratory soil test results, dynamic cone <br /> penetrometer (DCP) data,pavement coring and soil classifications with Atterberg limits. <br /> • Falling weight deflectometer (FWD) data,plots and analysis results of the field explorations <br /> and testing of pavement sections using the MODULUS software. <br /> • Recommended pavement rehabilitation and designs for new pavements. <br /> • Design criteria used in determining pavement designs,including traffic loads,pavement <br /> material characterization, environmental conditions, and pavement design life. <br /> • Design summary from the program used to design (e.g., FPS 21, DARWin, and MODULUS <br /> 7.0) <br /> • Pavement material specifications based on City of San Marcos and/or TxDOT standard <br /> construction specifications. <br /> • Other considerations used in developing the pavement designs, including subgrade <br /> preparations and stabilization procedures will be as provided. <br /> Assumptions <br /> The following assumptions were made in developing the scope and fee estimate for this project: <br /> • Boring locations are not finalized yet. Boring locations will be mutually agreed upon by Tetra <br /> Tech and HVJSCTx. The proposed boring locations may need to be adjusted to avoid utility <br /> conflicts, and/or limit traffic control requirements. <br /> • Traffic control will be required for drilling. <br /> • City permit will be required. We understand city permit fee (if there is any) will be waived. <br /> • Tetra Tech shall provide HVJSCTx with an electronic site map. <br /> • Surveying of the boring locations will be done by others,if required. <br /> • HVJSCTx will be responsible for avoiding conflicts with utility facilities by contacting the <br /> One Texas calling facility. <br />