My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> Mr.Jaime R. Kypuros,Jr.,PE <br /> City of San Marcos Wallace Subdivision <br /> August 13,2024 <br /> SGT 24 1041 <br /> • Preparation of Geotechnical Baseline Report for trenchless installation, and trenchless <br /> installation recommendations are not included in our scope of work. <br /> • City will provide any available historical traffic data or input concerning major traffic <br /> generators for pavement designs will be provided. <br /> • HVJSCTx will submit a proposal for additional services should any additional pavement <br /> design alternatives, and construction phase services are requested. <br /> Fee <br /> HVJSCTx will perform the outlined scope of work for the Lump Sum amount of$41,830.00. If <br /> anomalous soil conditions are encountered, or if the project configuration changes significantly, <br /> additional work may be required. HVJSCTx will recommend such additional work when and if it is <br /> deemed necessary. <br /> Schedule <br /> We propose to initiate project scheduling and coordination,immediately upon receiving notice-to- <br /> proceed. We subsequently expect to complete the test borings approximately 2 to 3 weeks after <br /> receiving notice to proceed and permits. Laboratory testing, evaluation of test results, engineering <br /> analyses and report preparation will take approximately 3 to 4 weeks after completion of the <br /> fieldwork. <br /> The estimated schedule for the pavement design work is as follows: <br /> Task Estimated Schedule,weeks <br /> Field coordination and permits 1 - 2 after receipt of Notice to Proceed (NTP) <br /> Field FWD - NDT testing 1 - 2 depending on permit receipt and/or weather <br /> Draft pavement design report 2 - 3 depending on receipt HVJ SCTx draft geotechnical report <br /> Final pavement design report 2 - 3 after receipt of HVJ SCTx,RPS-Tetra Tech , and City of San <br /> Marcos combined comments <br /> Insurance <br /> Insurance certificates verifying HVJSCTx general liability, auto,workers' compensation, and errors <br /> and omissions insurance coverage, listing Tetra Tech and City of San Marcos as a certificate holder, <br /> will be provided upon request. <br /> Sample Retainage <br /> Soil samples will be retained in our laboratory for 30 days after the draft geotechnical investigation <br /> report has been submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.