My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> Wallace Addition Subdivision <br /> August 27, 2024 <br /> Page 2 of 4 <br /> • TRG will perform records research and acquire available existing utility records within the <br /> project limits. This will include contacting the applicable One Call agency and associated <br /> utility owners/municipalities to request records and reviewing available utility record <br /> information obtained. <br /> • TRG will attempt to designate the following utilities within this area: potable water, <br /> reclaimed water, chilled water, natural gas/crude oil/refined product pipelines, <br /> communication duct banks, fiber optic, cable television, telephone, and electric. <br /> • Wastewater and storm drain facilities will be inverted at manholes, and will be depicted as <br /> QLC information. <br /> • TRG will attempt to designate utility service lines, however, because these lines are often <br /> non-conductive and not shown on records TRG cannot guarantee all service lines will be <br /> included in the final deliverables. <br /> • The following facilities/items are specifically excluded from the scope of work of this <br /> proposal: irrigation lines, overhead utilities, and detailed vault investigations. <br /> • TRG will attempt to provide Electronic Depth readings calculated by TRG's geophysical <br /> equipment. If Electronic Depth readings can be obtained, they will be provided every 50 <br /> feet. However, due to the inconsistency with Electronic Depth readings, TRG cannot <br /> guarantee the accuracy of the information. Data will be provided for informational <br /> purposes only. <br /> This proposal also includes up to sixteen (16) QLA SUE test holes at locations that will be <br /> provided by the Client following a review of the QLB SUE information. TRG has made the <br /> following assumptions related to test hole excavations on this project: <br /> • Test holes will be excavated using vacuum excavation equipment. <br /> • All test holes will be accessible to truck/trailer-mounted vacuum excavation equipment. <br /> Any special requirements needed to access test hole locations (clearing, grading, mat <br /> installation, etc.)will be provided by others at no cost to TRG. <br /> • Right-Of-Way (ROW) permits from the City of San Marcos will be required. TRG will <br /> obtain all required City permits and ensure that coordination and compliance with the City <br /> is provided. <br /> • Designed traffic control plans will not be required. <br /> • Traffic control measures will be required. TRG will acquire the services of a qualified <br /> Maintenance-Of-Traffic (MOT) Subcontractor, and ensure that adequate traffic control is <br /> provided. <br /> • Pavement coring/repair will be required. TRG can core pavement up to a depth of 12 <br /> inches. Asphalt surfaces will be repaired with an asphalt cold patch, and concrete cores <br /> will be epoxied in place, flush with the surrounding surface. <br /> • The following item is excluded from this scope of work: full-section pavement repair <br /> (including sidewalks) <br /> • Excavation in rock, or to a depth greater than 18 feet, is considered beyond the scope of <br /> this proposal. <br /> Smmbsmirl'a e LJfili( r Ligiiiiecriiiig I LJfili(' r iw"oordiiiiatioiiii. <br />
The URL can be used to link to this page
Your browser does not support the video tag.