Laserfiche WebLink
1.2 TASK 1-MOBILIZATION <br />The Consultant will: <br />1.2.1 Deploy its equipment and personnel to the Project area. <br />1.2.2 Attend all project initiation Meetings. <br />1.2.3 Develop and organize field task efforts. <br />1.2.4 Develop Project status reporting formats. <br />1.2.5 Develop formal communication channels. <br />1.2.6 Develop field task maps and data collection formats. <br />1.2.7 Coordinate with the City in preparing and submitting invoices. <br />1.2.8 Develop channels for communication of City action items. <br />1.2.9 Prepare and submit a plan for security of Project documents. <br />1.3 TASK 2 -ABOVE GROUND PHYSICAL INSPECTION <br />The Consultant will: <br />1.3.1 Locate system assets for incorporation into the updated maps and note evidence of <br />potential problems with the City's sewer system. Utilize infrared scanning, geophysical scanning <br />("GEMS"), limited smoke testing and electronic line locating systems as required to locate <br />manholes or trace out sewer trunk mains and interceptors. <br />1.3.2 Provide field crews to temporarily mark the located system assets to facilitate any City <br />provided GPS survey. <br />1.3.3 Investigate the study areas for the purpose of documenting all system assets not shown on <br />the current system maps <br />1.3.4 Document evidence of sinkholes and line breaks. <br />1.3.5 Provide a listing of system assets that are shown on the existing system maps, but not <br />located in the field. <br />1.3.6 Provide a listing of system assets located by field crews but not shown on the existing <br />system maps. <br />GSWW, Inc. Contract <br />2 <br />