My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:54:00 PM
Creation date
1/13/2025 4:47:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-001
Date
1/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:8EB6DDAC-ED8E-4C5E-8B6E-93915DB01 CF6 <br /> 8. I am funding a project with CDBG funds that were obligated(i.e.,the grant agreement <br /> was signed by HUD)before November 15,2022.Does the BAP apply? <br /> No,the BAP does not apply to HUD funds that were obligated before November 15,2022. <br /> HUD defines the date of obligation as the date that HUD signed the agreement with the <br /> grantee. The BAP will apply to CDBG funds used for iron or steel that were obligated on or <br /> after November 15, 2022. <br /> There is an additional consideration. If FY funds for which BABA applies are added to this <br /> infrastructure project, BABA then will apply to the entire project. <br /> 9. I am a grantee funding a project with CDBG funds that were obligated(i.e., the grant <br /> agreement was signed by HUD) on or after November 15,2022.Does the BAP apply? <br /> If the CDBG funds used in your infrastructure project were obligated on or after November <br /> 15, 2022,the BAP will apply to all iron or steel used in the project, unless a waiver applies <br /> to the project. If these BABA funds are applied to an infrastructure project that does not <br /> have a BAP,the addition of these funds will attach BABA to the entire project. BABA <br /> would apply as described in HUD's Phased Implementation Waiver unless there is a <br /> project-specific waiver approved by the MIAO. <br /> 10. I am funding a public facilities project with total FFA of$2,500,000. $400,000 of <br /> CDBG funds are being used for engineering and administration fees of a project. <br /> Other federal funding will pay for the remaining construction activities. Is the BAP <br /> applicable to this project? <br /> Yes,the total project cost is over$250,000 and the project is construction of an <br /> infrastructure project. The total cost of a project must not exceed$250,000 from all sources <br /> to qualify for an exemption of the BAP under HUD's general waiver for small projects. <br /> Documentation and Grant Management <br /> 11. Does the BAP apply to subrecipients or contractors? <br /> In most cases,yes,the BAP requirements apply to subgrantees, including subrecipients, <br /> contractors, and developers who are awarded Federal financial assistance for use in public <br /> infrastructure projects. The BAP requirements apply to all FFA and do not distinguish <br /> between the end user of the federal funds. The BAP applies as long as the funding is derived <br /> from a Federal agency, even if they are a pass-through entity unless a particular section of <br /> the terms and conditions of the Federal award specifically indicates otherwise. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.