My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:54:00 PM
Creation date
1/13/2025 4:47:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-001
Date
1/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:8EB6DDAC-ED8E-4C5E-8B6E-93915DB01 CF6 <br /> 12. Is there standard language grantees can include in subrecipient/bid contract <br /> documents? <br /> Grantees should include the BABA language from their grant agreement in any subrecipient <br /> and bid contract documents to ensure BABA compliance by subrecipients, developers <br /> and/or contractors. Please refer to Addendum 3 for the language used in CPD grant <br /> agreements. <br /> Waivers <br /> 13. Are there any waivers available for the BAP? <br /> There are currently four general applicability waivers in effect for HUD programs that apply <br /> to CPD programs: 1)Phased Implementation Waiver, 2) Exigent Circumstances Waiver, 3) <br /> De Minimis, Small Grants, and Minor Components Waiver, and 4) Tribal Recipients <br /> Waiver. The details of each of these waivers can be found in Section IV of this Notice, or <br /> by visiting HUD's BABA website to see the latest available HUD waivers at: <br /> https://www.hud.gov/program_offices/general_counsel/baba. Waivers, as they are approved <br /> by the MIAO,will be updated on HUD's website. <br /> 14. Will there be project or product specific waivers of the BAP? <br /> In addition to HUD's general waivers,HUD may also grant"project-specific"waivers from <br /> the BAP for covered FFA on a limited, case-by-case basis, after consultation and review <br /> with the MIAO at OMB. HUD may issue a project-specific waiver to the BAP if it is <br /> determined that a waiver falls into one of the following three categories: 1)when applying <br /> the domestic content procurement preference would be inconsistent with the public interest, <br /> 2)when types of iron, steel, manufactured product or construction materials are not <br /> produced in the United States in sufficient and reasonably available quantities or of a <br /> satisfactory quality, or 3)where the inclusion of those products and materials will increase <br /> the cost of the overall project by more than 25 percent. A waiver for a specific project may <br /> vary depending upon the circumstances of the project, and specific items,products, or <br /> materials in question. . HUD is currently developing the process through which a grantee <br /> may request a waiver. More information will be made available once that process is <br /> developed. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.