My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:54:00 PM
Creation date
1/13/2025 4:47:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-001
Date
1/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:8EB6DDAC-ED8E-4C5E-8B6E-93915DB01 CF6 <br /> Addendum 2 <br /> Examples of BAP for CPD Programs <br /> This appendix provides a selection of illustrative examples to assist grantees in determining if the <br /> BAP applies to their projects. <br /> Example 1: A grantee funds a water and sewer project containing iron and steel. The project is <br /> funded using $1 million in FY23 CDBG funding. The total Federal financial assistance for the <br /> project is $3 million. <br /> The BAP applies to this project because it is a CDBG project using funding obligated on or after <br /> November 15, 2022,the project contains iron or steel, and the total cost of the project is greater than <br /> the simplified acquisition threshold at 2 CFR 200.1 which is currently $250,000. <br /> Example 2: A grantee funds a water and sewer project containing iron and steel. The project is <br /> funded using $100,000 in FY23 CDBG funding. The total Federal financial assistance for the <br /> project is $2 million. <br /> The BAP applies to this project because it is a CDBG project using funding obligated on or after <br /> November 15, 2022,the project contains iron or steel, and the total cost of the project is greater than <br /> $250,000. <br /> Example 3: A participating jurisdiction contributes $2 million in HOME funds for construction of a <br /> multi-unit residential building,which includes iron or steel. The funds are obligated by HUD on <br /> July 15,2023. <br /> The BAP does not apply to this project because the BAP will not apply to HOME funds used for <br /> iron or steel until August 23, 2024. <br /> Example 4: A participating jurisdiction contributes $2 million in HOME funds for the construction <br /> of a multi-unit residential building,using iron or steel. The funds are obligated by HUD after <br /> August 23, 2024. <br /> The BAP applies to this project because the project includes iron or steel,the total cost of the project <br /> is greater than $250,000, and the project uses HOME funds obligated after the date on which the <br /> BAP begins to apply to HOME funds used for iron or steel. <br /> Example 5: A grantee funds acquisition of land using $300,000 in Recovery Housing Program <br /> (RHP)funds that were obligated on September 1, 2023. The acquisition is part of a multifamily <br /> housing construction project containing iron or steel. <br /> The BAP applies because the purpose of the funding is a covered activity (construction)that <br /> includes iron or steel. The total cost of the project from all sources is greater than $250,000 and the <br /> funds are obligated after the date on which the BAP applies to RHP funds used for iron or steel. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.