Laserfiche WebLink
000usign Envelope ID:4n4EA4Ao-341A-4F7n+AaoF-AonoAc4AEono <br /> EXHIBIT <br /> �� 4O85Cibo|oConyon�Suite 2OO.San Antonio,TX782Gl <br /> ��� <br /> ���= � poone�m-*o2'a/*2|anmwe,n@a/poa�omuen.00m <br /> Building�Fa°=vs���° wwwalpoafaomues.mm <br /> May 30, 202S <br /> Rachel Shelton, CTCD, CTCM <br /> Procurement Program Administrator <br /> City ofNew Braunfels <br /> 512.393.8174 <br /> Dear Ms. Shelton: <br /> Re: Facility Condition Assessment, Asset Inventory, Asset Tagging, Acceooib|ity Surveys, Preventive Maintenance <br /> Schedule Development and Labor Requirement Analysis Services <br /> Approximate Gross Square Footage: 926,322GSF <br /> As a follow up to our recent discussion,thank you for the opportunity to provide you with a proposed scope of <br /> work, deliverables, schedule, and a proposal for your consideration. <br /> Scope mfWork <br /> |. Capital Plmmm[mg Facility Condition Assessment <br /> As part of this work effort, we will perform a lifecycle cost analysis of the existing building systems to include <br /> current capital investment, current operating costs, and future capital replacement costs.The analysis will also <br /> include risk analysis of existing building systems. <br /> Facilities will be assessed by our assessment teams comprised of qualified architects, engineers and/or <br /> construction professionals. Our teams will include a professional to assess architectural and mechanical, <br /> electrical and plumbing components of your facilities. <br /> Our teams will evaluate the condition and estimate the remaining service life for the purposes of renewal <br /> forecasting for the building systems shown below. <br /> 1. Exterior Enclosure B20: B2010 Exterior Walls, B2020 Exterior Windows and B2030 Exterior Doors <br /> 2. Roofing System B30: B3010 Roof Coverings, Flashing,Trim, Gutters and Downspouts. <br /> 3. Interior Construction C10: C1010 Partitions and Walls, C1020 Interior Doors, C1030Speda|tieo <br /> (compartments, cubicles,toilet partitions, lockers, casework and cabinetry) <br /> 4. Stairs C20: C2010 Stair Construction (interior/ Exterior Stairs, Fire Escapes, Guardrails, Handrails and <br /> accessories) <br /> S. Interior Finishes C3O: C1010VVa|| Finishes, C3020 Floor Finishes, C3030 Ceiling Finishes and C3040 |nt <br /> Coatings/Special Finishes <br /> 6. ConveVingO1O: D1010 Elevators and Lifts <br /> 7. Plumbing O20: D2010 Plumbing Fixtures, D2020 Domestic Water Distribution, D2030 Sanitary Waste, <br /> D2040 Rainwater Drainage (Roof drains and sump pump systems) <br /> 8. Hl/ACO3O: D3010 Energy Supply, D3020 Heat Generation Systems, D3030 Cooling Generation Systems, <br /> D3040 Distribution Systems, D30S0 Terminal and Package Units <br /> 9. Fire Protection O40: D4010 Fire Alarm and Detection, D4020 Fire Supply Water Syotemo/ Equipment, <br /> D4030 standpipe Systems, D4040 Sprinklers and D4090 Suppression Systems <br /> 10. E|ectricm| O6O: D5010 Electrical Service and Distribution, D5020 Lighting and Branch Wiring, D5030 <br /> Communications &Security, D5090 Lightning Protection Systems <br />