Laserfiche WebLink
Docusign Envelope ID:494EA4AD-341A-4F79-A86F-A35BAC4AE353 <br /> 11. Site Improvements: G20: G2010 Roadways, G2020 Parking Lots and G2030 Pedestrian PavingVehicular <br /> and Pedestrian Pavements (Immediately adjacent to the facilities receiving services) Assessment of G2010, <br /> G2020 and G2030 includes a visual inspection of the surfaces and associated curb,gutters and drainage <br /> inlets. These include visual inspections and will not require the removal of the associate grates or man hole <br /> lids. G2040 Site Development will include the visual assessment of all property fencing and gate systems <br /> to document deficient conditions where they exist and to create renewal schedules for the fencing <br /> systems at the system level. Site lighting systems will be assessed from a perspective of functionality only. City <br /> staff will be available to turn on the lighting systems so that non-functioning systems can be documented. A <br /> photometric study to determine adequacy of existing lighting systems is NOT included.We will also include <br /> inspections of current retaining walls and raised planter boxes.We will document deficient conditions and develop <br /> renewal schedules for these elements. Building and parking lot signage will be included as visual inspections to <br /> confirm that the signage exists and is securely fastened. D2050 Landscaping will include the visual assessment of <br /> all site drainage to ensure that positive drainage is occurring away from the facilities. We will also include visual <br /> inspections of any observed site drainage inlets or catch basins to document deficient conditions. Irrigation system <br /> inspections will include the visual observation of irrigation systems while in operation to document any <br /> deficiencies as well as leaks observed within the systems. A city provided resource will be responsible for turning <br /> on the systems and advancing through the zones as part of this work effort. <br /> Assumptions <br /> Client will provide mechanical room keys (when escorts are not available),floor plans and copies of maintenance <br /> logs as requested to support the project. <br /> Definition of Data and Data Collection Standards <br /> We will assist in defining facility condition data standards and collection standards. We will also use these <br /> standards to assess and report conditions for the property elements noted above. <br /> Digital Photographs <br /> Digital photos will be captured and used for internal quality control purposes. Photos will be captured for <br /> building identification and documentation of asset and system conditions. Select photos will be used within the <br /> narrative reports; however, all photos will be made available through a Share Point site for the client's <br /> convenience. Geo-Location services will be turned on so that Geotag metadata can be captured with the <br /> photos. City of San Marcos will provide the required WiFi hotspots for the connectivity required. <br /> Corrective Action Recommendations and Costing <br /> Using our internal capital planning software budgets will be provided for deficient conditions identified during <br /> the facility condition assessment. Parametric cost estimates are based on nationally recognized estimating data <br /> such as RSMeans. <br /> Deficiency Prioritization <br /> We understand the reduction of the current backlog of maintenance items to be a multi-year task, and we must <br /> be able to assign a priority to each deficiency. Before data collection begins, we will work with you to establish <br /> prioritization standards. <br /> Data Analysis and Reports <br /> Facility Condition Index(FCI) <br /> We will develop an, FCI to quantify the deficiencies in each building. Our data is used to report the relative <br /> condition of buildings using a ratio of needed repairs (NR) over current replacement value (CRV)for the facility <br /> condition index(FCI).This ratio will allow you to sort your facilities into a list of"worst first."This list will <br /> become a powerful document when planning and prioritizing remediation. <br /> FCI = {Needed Repairs <br /> }x 100 <br /> (CRV) <br /> 2 <br />