My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Executive Summary <br /> Executive Summary <br /> The City San Marcos is planning for the construction of the proposed FM 1978 Water Reclamation <br /> Facility with an initial permitted treatment capacity of at least 2.0 MGD with phased expansions up to <br /> 8.0 MGD. <br /> This Basis of Design report identifies the major components of the proposed FM 1978 Water <br /> Reclamation Facility that need to be constructed as part of this project.The components proposed for <br /> the facility are illustrated in various exhibits in Appendix A and alternatives for Design-Builder (DB) <br /> consideration are discussed in this report. <br /> The major components and design alternatives to be considered include the following: <br /> • Influent Lift Station <br /> • Primary Treatment <br /> • Secondary Treatment <br /> • Tertiary Treatment <br /> • Disinfection <br /> • Plant Water System <br /> • Biosolids Treatment&Handling <br /> • Plant Electrical <br /> • Instrumentation&SCADA Systems <br /> • Administration,Operations&Support Buildings <br /> • Odor Control <br /> • Site Improvements <br /> • Plant Outfall <br /> • Temporary facility <br /> ES-5 <br /> ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.