My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A-Basis of Design <br /> Section 1 <br /> Project Background <br /> 1.1 General <br /> The City of San Marcos ("the City")requests Statement of Qualifications from interested qualified <br /> Respondents to provide design and construction services of the new FM 1978 Water Reclamation <br /> Facility("the Facility"),in accordance with the terms and Scope of Services specified in the associated <br /> Request for Qualifications (RFQ).This will be accomplished through a progressive design-build <br /> project delivery method. <br /> Preliminary planning has identified to need for a phased approach to construction of the Facility with <br /> an initial phase capable of treating a permitted ADF of at least 2.0 MGD.The need for future <br /> expansions to the Facility are expected based on the anticipated construction of additional residential <br /> developments,and total build-out of the proposed Facility is expected to be capable of treating a <br /> permitted ADF of 8.0 MGD. <br /> This project involves a new site with no existing wastewater treatment capacity.Initial work outside <br /> of this project is being implemented by others to convey wastewater flows from areas planned for <br /> development to the proposed project site. <br /> 1.2 Project Drivers <br /> Ongoing residential development around the City of San Marcos is increasing the need for wastewater <br /> treatment services in the area southeast of the City.To address this need and provide a regional <br /> solution,the City has entered into a wastewater services and facilities cost sharing agreement <br /> (Agreement) with residential housing developers.This Agreement defines responsibilities for the City <br /> to construct and operate a regional facility to provide wastewater treatment services and for <br /> residential housing developers to construct wastewater infrastructure necessary to collect and convey <br /> flows to the regional facility. Figure 1-1 identifies the project site and residential development areas <br /> to be served by the proposed facility. <br /> Figure 1-1 FM 1978 Water Reclamation Facility Site with Residential Development Areas <br /> 1-1 <br /> ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.