Laserfiche WebLink
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A-Basis of Design <br /> Section 2 <br /> Design Criteria <br /> The Design-Builder(DB)will need to consider the substance of this report in its entirety for the <br /> Project's scope of work as described in the RFQ.This report will serve as the starting point and the <br /> basis of design for this project. <br /> 2.1 Project Site <br /> The Facility will be located on Fleming Pass Road near the address point of 538 Fleming Pass Road. <br /> Fleming Pass Road intersects FM 1978 approximately 1.75 miles northeast of SH 123,near San <br /> Marcos,TX.The selected project site is an"L"shaped parcel comprised of approximately 23 acres as <br /> shown below in Figure 2-1. <br /> Figure 2-1 Proposed FM 1978 Water Reclamation Facility Site Map <br /> 1 <br /> i� <br /> uwmu <br /> aua.os. <br /> sw <br /> N-IIMMSS. <br /> N:IfW1NIH <br /> PROP.WASTEWATER <br /> TREATMENTPLANT <br /> LOCATION <br /> (22.6 ACRES) s 0 <br /> r � <br /> 1 <br /> N:)s.swu <br /> L DSR.).4 • . <br /> �cS <br /> v91� <br /> The site has a 3.5%southwest to northeast slope with Cottonwood Creek located approximately 540 <br /> feet east of the site.The site is currently used as a grazing pasture for cattle with features including a <br /> stock <br /> pond at the westernmost end of the site and the York Fork tributary of the nearby Cottonwood <br /> ARDURRA 2-1 <br />