My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A-Basis of Design <br /> Creek at the northernmost end of the site. No known archaeological sites or artifacts have been <br /> discovered or identified.The site is owned by the City;however,it is located outside the current City <br /> Limits and ETJ of San Marcos in Guadalupe County <br /> 2.2 Design Horizon & Flow Projections <br /> Initial wastewater flow projections are based on a regional wastewater services and facilities cost <br /> sharing agreement(Agreement) between the City and residential housing developers.This Agreement <br /> includes a projected implementation schedule of Living Unit Equivalents (LUEs)that correspond to <br /> the anticipated pace of residential construction.Regardless of the pace of residential development,the <br /> City is responsible for treating wastewater flows and the DB will propose both interim and permanent <br /> alternatives to meet demands. <br /> As part of the developer agreement,the City is responsible for providing wastewater services starting <br /> September 1,2025 or when the first residential structure is completed. The anticipated total year-end <br /> number of LUEs that the City is contractually obligated to service through the Agreement is <br /> demonstrated below in Tables A-1 &A-2. <br /> Table 2-1 Annual LUEAbsorption Schedule from City s Development Agreement <br /> • TV <br /> 0 0 0 0 <br /> 200 0 160 120 � '• <br /> 240 150 160 240 •• <br /> 250 180 14 240 <br /> 300 200 0 240 <br /> 350 225 0 240 <br /> 350 225 0 240 <br /> 350 225 0 240 <br /> 350 195 0 240 <br /> 255 0 0 69 <br /> Table 2-2 Cumulative LUEAbsorption Schedule from City's Development Agreement <br /> ARDURRA 2-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.