My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A—Basis of Design <br /> The DB will not consider secondary treatment processes that utilize membranes.Proposed design <br /> alternatives will seek to balance energy efficiency with the ease of operation in both the selection of <br /> treatment processes and aeration equipment. <br /> The City has a preference for a"plug flow"process design,however alternative treatment processes <br /> that provide the best value to the City maybe considered. <br /> 3.4.2 Treatment Processes <br /> The DB will consider and propose design alternatives that include the following non-exhaustive list of <br /> potential components: <br /> • Conventional Activated Sludge: Barden Field <br /> • SBR: Sanitaire ICEAS advanced SBR I Xylem US <br /> • Carousel: Carrousel®System- Ovivo Water <br /> • Other: Aerobic Granular Sludge-Aqua-Aerobic Systems I Biological Treatment <br /> 3.4.3 Aeration Blowers <br /> The DB will consider and propose design alternatives including but not limited to air diffusers, <br /> mechanical aeration,multistage centrifugal blowers.The City does not currently have a preference for <br /> aeration equipment manufacturer(s). <br /> 3.5 Tertiary Treatment <br /> Tertiary treatment may be necessary to meet TPDES permit requirements and potentially water reuse <br /> standards.The City's operator has a preference for cloth media filters;however,the DB will consider <br /> and propose design alternatives that include the following non-exhaustive list of potential <br /> components for tertiary treatment: <br /> • Cloth media such as Aqua MegaDisk®-Aqua-Aerobic Systems I Cloth Media Filtration <br /> • Synthetic media such as HydrotechT"Discfilter I Veolia Water Technologies <br /> • Sand media. <br /> 3.6 Disinfection <br /> The DB will consider disinfection methods that will meet all TPDES permit requirements and be <br /> consistent with the City's preferences.The City will consider design alternatives recommended by the <br /> DB that can provide the best overall value. <br /> For the purposes of discharging treated effluent,the City has a preference for UV disinfection methods. <br /> For the purposes of reusing treated effluent,the City has a preference for sodium hypochlorite. <br /> 3.7 Plant Water System <br /> Potable water service is to be provided to the plant site through Crystal Clear Special Utility District <br /> (CCSUD).The City has initiated coordination with CCSUD <br /> The estimated potable water service need for normal plant operations and fire suppression service is <br /> listed in Table 3-1. <br /> �V <br /> 4-3 <br /> ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.