My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A—Basis of Design <br /> 3.13 Site Improvements <br /> The DB will consider and propose design alternatives that are compliant with all TCEQ and City of San <br /> Marcos development requirements including but not limited to those related to all-weather access <br /> road materials,landscaping <br /> Identified site improvements include but are not limited to: <br /> • Site fencing and security <br /> • All-weather access roads <br /> • Cut,fill,and leveling of site topography as needed to align with the hydraulic profile of Facility <br /> processes <br /> The DB will consider the City's standards for landscaping at the Facility.The Facility will not be <br /> required to meet all applicable landscaping standards,however,they should be followed when <br /> possible unless otherwise directed by the City to maximize value. <br /> 3.14 Plant Outfall <br /> 3.14.1 General <br /> The plant outfall will be consistent with the point of discharge as identified in the TPDES permit that <br /> the Facility will be subject to.A preliminary assessment has been conducted for the unnamed <br /> tributary located adjacent to the plant side and this report can be made available upon request. <br /> Figure 3-1 FM 1978 Water Reclamation Facility Proposed Discharge Map <br /> �V <br /> 4-6 <br /> ARDURRA <br />
The URL can be used to link to this page
Your browser does not support the video tag.