Laserfiche WebLink
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A—Basis of Design <br /> 3.13 Site Improvements <br /> The DB will consider and propose design alternatives that are compliant with all TCEQ and City of San <br /> Marcos development requirements including but not limited to those related to all-weather access <br /> road materials,landscaping <br /> Identified site improvements include but are not limited to: <br /> • Site fencing and security <br /> • All-weather access roads <br /> • Cut,fill,and leveling of site topography as needed to align with the hydraulic profile of Facility <br /> processes <br /> The DB will consider the City's standards for landscaping at the Facility.The Facility will not be <br /> required to meet all applicable landscaping standards,however,they should be followed when <br /> possible unless otherwise directed by the City to maximize value. <br /> 3.14 Plant Outfall <br /> 3.14.1 General <br /> The plant outfall will be consistent with the point of discharge as identified in the TPDES permit that <br /> the Facility will be subject to.A preliminary assessment has been conducted for the unnamed <br /> tributary located adjacent to the plant side and this report can be made available upon request. <br /> Figure 3-1 FM 1978 Water Reclamation Facility Proposed Discharge Map <br /> �V <br /> 4-6 <br /> ARDURRA <br />