Laserfiche WebLink
into this Agreement as though included verbatim herein. <br />12.3 In the event of any conflict between the Agreement and the provisions of any exhibit or <br />attachment to this Agreement, this Agreement will govern and control. <br />ARTICLE 13 <br />OTHER DUTIES AS SET FORTH IN THE CONSTRUCTION DOCUMENTS <br />13.1 Engineer will have such other duties and responsibilities and limitations of authority as <br />agreed to by Engineer in writing and as are set forth in the construction contract documents for <br />the Project. However in the event of conflict, dispute, or discrepancy between the provisions of <br />this Agreement and the construction contract documents, the more restrictive and/or burdensome <br />with respect to the Engineer's role and responsibility will govern and control. <br />ARTICLE 14 <br />NOTICES <br />14.1 Notices required under this Agreement will be provided by the parties to one another by <br />certified mail, return receipt requested, or by confirmed facsimile transmission, to the following <br />addresses: <br />To the City: <br />City Manager <br />City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br />Fax: 512-396-4656 <br />To the En ig Weer: <br />President <br />San Antonio Design Group, Inc. <br />2101 Lockhill Selma, Suite 216 <br />San Antonio, Texas 78213 <br />Fax: 210-342-6701 <br />ARTICLE 15 <br />BASIS OF COMPENSATION <br />15.1 The City will compensate the Engineer, in accordance with Article 5, Payments to the <br />Engineer, and the other terms and conditions of this Agreement, as follows: <br />15.2 The total of all fees and expenses to be paid to Engineer for Basic Services as described <br />in Sections 1.1 through 1.8 will not exceed $77,575.00. This compensation is divided among the <br />Basic Services as follows: <br />PROJECT AREA 1 - UHLAND/COUNTY ROAD <br />TASK 1-SURVEY $9,500.00 <br />TASK la -DRAINAGE STUDY $9,145.00 <br />TASK 2 -PRELIMINARY DESIGN $5,265.00 <br />TASK 3 -PUBLIC MEETINGS $ 750.00 <br />TASK 4 -INTERMEDIATE DESIGN $4,675.00 <br />TASK 5 -FINAL DESIGN $4,520.00 <br />19 <br />