Laserfiche WebLink
TASK 6 -BIDDING AND CONSTRUCTION ADMINISTRATION $4,700.00 <br />REIMBURSABLE EXPENSES $ 650.00 <br />TOTAL FEE PROJECT AREA 1 $39,205.00 <br />PROJECT AREA 2 -INTERSECTION OF PROSPECT AND BISHOP STREETS <br />TASK 1-SURVEY $3,000.00 <br />TASK 2 -PRELIMINARY DESIGN $4,565.00 <br />TASK 3 -PUBLIC MEETINGS $ 750.00 <br />TASK 4 -INTERMEDIATE DESIGN $3,870.00 <br />TASK 5 -FINAL DESIGN $3,910.00 <br />TASK 6 -BIDDING AND CONSTRUCTION ADMINISTRATION $3,660.00 <br />REIMBURSABLE EXPENSES $ 350.00 <br />TOTAL FEE PROJECT AREA 2 <br />$20,105.00 <br />PROJECT AREA 3 -INTERSECTION OF PARKER DRIVE AND OAKDALE DRIVE <br />TA5K 1-SURVEY $3,000.00 <br />TASK 2 -PRELIMINARY DESIGN $4,370.00 <br />TASK 3 -PUBLIC MEETINGS $ 750.00 <br />TASK 4 -INTERMEDIATE DESIGN $3,335.00 <br />TASK 5 -FINAL DESIGN $2,965.00 <br />TASK 6 -BIDDING AND CONSTRUCTION ADMINISTRATION $3,495.00 <br />REIMBURSABLE EXPENSES $ 350.00 <br />TOTAL FEE PROJECT 3 <br />TOTAL CONTRACT FEE: <br />$18,265.00 <br />$77,575.00 <br />15.3 Compensation for Basic Services and for Additional Services of the Engineer will be <br />computed based on the Engineer's standard hourly rates: <br />Principal $125.00 <br />Project Manager $115.00 <br />Senior Engineer $ 95.00 <br />Designer $ 60.00 <br />Engineering Technician $ 55.00 <br />Clerical $ 50.00 <br /> <br />20 <br />