My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-188 Approving an on-call professional services agreement with Kimley-Horn and Associates Inc. for the the Transportation Master Plan Update Project.
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-188 Approving an on-call professional services agreement with Kimley-Horn and Associates Inc. for the the Transportation Master Plan Update Project.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:11:58 AM
Creation date
10/21/2025 2:39:13 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-188
Date
10/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB4FCDA1-A564-4=-13116-E72FBD797168 <br />2.7 Pop -Up Events <br />The CONSULTANT team will complement online engagement with in -person pop- <br />up events to engage the community. The CONSULTANT team will host four (4) <br />pop-up events for up to four (4) hours each at regularly scheduled City events, as <br />identified by the City, to promote participation in surveys and interactive maps. <br />Pop-up events will include up to two (2) members from the CONSULTANT team. <br />• Kick -Off (Pop -Up Event #1 & #2) 1 Information Gathering and Needs <br />Identification: A planned community event to gather input on the location of <br />specific needs and goals of the community. <br />• Community Studio (Pop -Up Event # 3 & #4) 1 After data is collected about what <br />the existing issues are, this public meeting will serve to find out more about <br />how to address them. Activities could include a mapping activity, dot voting, <br />and / or a budgeting activity. During this public meeting, PublicCoordinate <br />should be updated to provide similar online participation. <br />Deliverables: Pop-up Event Preparation and Facilitation <br />2.8 Goals and Objectives <br />Community transportation goals and TMP objectives will be developed by the <br />CONSULTANT after the first SOC in Task 2.5. Potential goals and objectives will <br />be sourced from local plans, such as the 2018 San Marcos Transportation Master <br />Plan, Thoroughfare Plan, Sidewalk Plan, Bicycle Plan, and Greenways Plan, <br />Vision SMTX Comprehensive Plan, and others identified by the CONSULTANT <br />and staff. These goals and objectives will inform project prioritization, needed <br />programs, and policy recommendations. <br />Deliverables: Goals and Objectives (Draft with up to 1 revision) <br />2.9 Engagement Report <br />The CONSULTANT will prepare an engagement report that summarizes <br />engagement efforts and findings for the project. The report will document the <br />engagement methods used, present quantitative data, such as number of <br />participants and responses, and identify key takeaways from each round of <br />engagement. <br />Deliverables: Engagement Report (Draft with up to 1 revision) <br />3. DATA COLLECTION & NEEDS ASSESSMENT <br />3.1 Review of Plans, Policies, and Design Criteria Manual/Standards <br />The CONSULTANT will review local documents and plans that will serve as a <br />reference throughout the project. It is anticipated this information will be <br />synthesized into 4-5 pages of "past plans" and incorporated into the final <br />document, such as the 2018 San Marcos Transportation Master Plan, <br />Thoroughfare Plan, Sidewalk Plan, Bicycle Plan, and Greenways Plan, Vison <br />City of San Marcos Kimley-Horn and Associates, Inc. <br />TMP Exhibit B Scope of Services Page 8 August 21, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.