Laserfiche WebLink
AIRPORT MASTER PLAN �� BAN MARCOS <br />1R lk G I INU, AYSP <br />um�u <br />IIIIm j������ IIIII�°� °����)YIIII�� )U j������ IIII 11" I M <br />INTRODUCTION AND PURPOSE <br />An Airport Master Plan (AMP) evaluates an airport's physical facilities, management <br />principals, planned development, and financial foundation for the future. Because <br />the aviation industry is not static, periodic updates are needed to refresh this <br />information and identify future plans and expectations. The San Marcos Regional <br />Airport (HYI) has had some significant changes since the previous airport master <br />plan was completed in 2001. These changes include changes in area economic <br />conditions, increased based aircraft demand, and changes in fleet mix. <br />This master plan will focus on examining existing facilities, forecasting future <br />aviation demands, identifying the projects necessary to meet that demand, and <br />examining the financial means to achieve the short- and long-term goals for San <br />Marcos Regional Airport. Additionally, the master plan will serve as a tool to aid <br />airport officials in their decision -making regarding San Marcos Regional Airport's <br />upkeep and future development. <br />An overview of the AMP process is provided in Figure 1-1. <br />Introduction Chapter Pagel of 4 <br />October 2020 <br />