Laserfiche WebLink
EXHIBIT D <br />Qualified PID Costs <br />Whisper South <br />Exhibit D <br />Qualified PID Costs <br />4/12/2021 <br />PID Qualified Costs: [a] <br />Major Improvements <br />Roadway <br />$ 4,076,860 <br />Water <br />540,034 <br />Water Tower IN <br />250,000 <br />Wastewater <br />1,728,876 <br />Drainage <br />2,955,855 <br />Parks / Landscaping / Trails <br />500,000 <br />Subtotal - Hard Costs <br />$ 10,051,625 <br />Construction Management Fee @ 4%[`] <br />402,065 <br />Soft Costs <br />148,181 <br />Total <br />$ 10,601,871 <br />Footnotes: <br />[a] Per developer. Engineer OPC to be provided prior to levying PID assessment. <br />[b] Assumes water tower will be maintained by the Maxwell SUD. <br />[c] Estimate only. <br />PID Petition 29 <br />