Laserfiche WebLink
Docusign Envelope ID: E74COCFE-CO64-4OD2-A75B-E107999569F8 <br />Scope Of Work <br />A Federal Funding? If yes, add additional task to meet federal funding regnirenients, <br />1) Task L <br />2) Task 11: <br />3) Task III: <br />B, Data Collection/Review <br />1) Review Reports/Studies/Drawfiigs <br />2) Site Visit(s) <br />3) StaffMeeting(s) <br />C. Survey - Sec Geneiat Requirements in the. GIS Cheek List for Survey Requirements <br />1) Acquire Temporary Right of Entry <br />2) Establish Project Control — set 3 monuments minimum (typically every project) <br />3) ROW Survey — How detailed the ROW research needs to be? {Specify One} <br />a) Route Survey per TSPS Manual of Practice Requirements for Category 2 —Route Survey — typically used for most project <br />b) Boundary Survey — typically for full depth reconstruction with drainage. Signed and sealed boundary survey shall be submitted per <br />TSPS Manual of Practice Requirements for Category lA—Land Title Survey <br />4) Existing Conditions Survey— Survey all utilities & surface features within the project limits. <br />Elevations for all inverts and top of lids. How far inside ROW? XX Feet? <br />5) Topographic Survey {Specify One} <br />a) Use COSM Lidar + Limited Topo Survey <br />b) Full topographic survey with enough detail to prepare l' contours <br />6) Tree Survey - Specify which level of details is needed. Project limits exhibit agreed on in advance. {Specify One} <br />a) All trees 9" and above should be surveyed and tagged — Typical Option <br />b) All trees & shrubs should be tagged within project limits — Rarely used <br />c) Condition Assessment by Consultants/City Arborist after trees are tagged and surveyed by surveyor. <br />Occurs after 6.a. and tree mitigation table and after 60% submittal. May be added by CIS if needed. <br />7) General Land Office Exhibit <br />8) Bathymetric Survey <br />D. Field Investigations <br />1) Subsurface Utility Locate <br />2) Geotechnical <br />3) Geological Assessment - Typically Recharge Zone Only <br />E, Determine pasement/Land Acquisition Requirements <br />1) Prepare Aerial Exhibits showing Temporary Workspace Limits as well as proposed easement/ROW takings. <br />2) Field Notes <br />3) Appraisal — Typically completed with on -calls <br />4) Title Work — Typically completed with on -calls <br />5) Negotiations of Easements — Typically completed in-house <br />F. Environmental Evaluation <br />1) Desktop Environmental Evaluation <br />a) Limited Field Surveys <br />b) Environmental Constraints Identification Map <br />2) Enviommental Constraints Summary Report <br />3) Threatened and Endangered Species of Waters of the U.S. Determination <br />a) Field Delineation <br />b) Due Diligence Summary Report <br />4) Cultural Resource Assessment <br />a) Desktop Research and Agency Coordination Letter <br />b) Intensive Cultural Resources Field Survey <br />c) Reporting and Agency Coordination <br />3) Hazardous Materials <br />a) Field Surveys <br />b) Phase 1 ESA <br />A. Meetings <br />7772777777712717 <br />1) Project Meetings <br />2) Public Meetmg(s) <br />3) Prepare Exhibits For Public Meetings <br />4) Utility Coordination Meeting(s) <br />B. Pipelines — Wastewater (gravity main). <br />1) Determine Alignment(s) <br />2) Preliminary_ Hydraulics/Modeling — Typically not required, refer to Master Plans <br />3) Other( ) <br />C. Pipelines'— Wastewater (force main) <br />1) Determine Alignment(s) <br />2) Preliminary_ Hydraulics/Modeling — Typically not required, refer to Master Plans <br />3) Other( ) <br />D, Pipelines Water <br />01/19/2021 Page 12 Of 43 1of5 <br />