Laserfiche WebLink
Docusign Envelope ID: E74COCFE-CO64-4OD2-A75B-E107999569F8 <br />1) Determine Alignment(s) <br />2) Preliminary_ Hydraulics/Modeling Typically not required, refer to Master Plans <br />3) Other( ) <br />E, Plants/Facilities <br />1) Develop Design Parameters <br />2) Other <br />F, Streets <br />1) Traffic Counts <br />2) Cross -Section Alternatives <br />3) Complete Street Assessment <br />4) Traffic Signals <br />5) Sidewalks <br />6) Other( ) <br />G, ;San Marco's Electric (SMEU) . <br />1) Underground Conduit <br />2) Photometric for Street Lighting (check with SMEU, they have in-house as well) <br />3) If effected by project, coordination required <br />H. Drainage <br />1) Watershed Analysis <br />2) Determine Alignments <br />3) Preliminary Hydraulics/Modeling <br />4) LID/Water Quality <br />5) Other( ) <br />L P,roject Sustainability j <br />1) Alternative Methods For Construction- Alternatives City should consider to improve the project, include associated tradeoffs <br />2) Alternative Green Solutions <br />3) Review Engineering Sustainability Checklist <br />1. Texas Historic Commission <br />1) Letter Only to THC - typically projects that occurs within limits of an existing road <br />2) Archeological - Desktop Review and short report to THC (Typically undisturbed areas) <br />3) Archeological - Full Review with Shovel Test and detailed report to THC <br />K: Determme Project Permittmg/Desip Requirements <br />Review Project to determine if any additional permits are needed (Typical Permits listed below) <br />1) TxDOT ROW <br />2) County ROW <br />3) Floodplain Zone <br />4) TCEQ <br />a. Edwards Contributing <br />b. Recharge Zone <br />c.WPAP <br />d. SCS <br />5) TPWD - Parks <br />6) UPRR - Railroad <br />7) FAA Jurisdiction <br />8) Army Corps <br />9) US Fish and Wildlife <br />10) General Land Office (GLO) <br />11) Other( ) <br />Ir, Utility Coordination <br />1) Review Project to determine which utilities are within the project limits <br />2) Identify Utility Conflicts - Prepare an overall exhibit and utility conflict matrix <br />3) Coordinate with Utility Companies to resolve conflicts — Typically handled by City Staff <br />811 <br />Pedernales Electric <br />Bluebonnet Electric <br />Century Link <br />CenterPoint Gas <br />Enterprise Gas <br />American Tower <br />LCRA <br />Maxwell <br />Time Warner <br />Zayo <br />AT&T <br />Grande <br />Texas State University_ <br />Crystal Clear <br />GBRA <br />FiberLight <br />Spectrum <br />AEP <br />Energy Transfer Partners <br />Countyline Special Utility District <br />M,' Cost Estimate <br />01/19/2021 Page 13 Of 43 2of5 <br />