Laserfiche WebLink
Docusign Envelope ID: E74COCFE-CO64-4OD2-A75B-E107999569F8 <br />1) Develop Construction Cost Estimates <br />N, Deliverables - <br />1) Monthly Status Report (PDF) <br />2) Preliminary Engineering Report Draft (1 PDF) <br />3) Preliminary Engineering ReportFnml (1 PDF, 1 DWG) <br />4) GIS Submittal Checklist & Additional Required Submittals. <br />5) Plan Sheets - Specify Size <br />a) Roll Plot - size & scale as determined by Consultant <br />b) 1 V x 17" per Engmeermg/CIP Plan Review Checklist <br />6) Notes: <br />A, Meetings <br />1) Project Meetings <br />Enter Weekly, Monthly, or Specify: <br />2) Public Meetmg(s) <br />3) Prepare Exhibits For Public Meetings <br />4) Utility Coordination Meeting(s) <br />5) Design Review Workshops <br />B, Design Sheet Categories <br />1) Cover Page <br />2) Index <br />3) General Notes <br />4) Quantity Table — By Sheet (Required by 90 % submittal) <br />5) Project Layout & Survey <br />6) Typical Sections <br />7) Tree Mitigation - Table Of All Trees & Plan of Replacement Trees. If number of trees are small, show on Erosion Control Sheets <br />8) Erosion Control - {Specify} <br />a. SWPPP - TXDOT Template (Required on all projects) <br />b. EPIC - TXDOT Template (Required on all projects) <br />c. Permanent & Temporary - combined as one plan set <br />d. Permanent & Temporary - prepared as 2 separate plan sets <br />9) Sequence of Construction/Phase (can be combined with Traffic Control Narrative if needed) <br />10) Traffic Control Plan {Specify One} <br />a. Minimum Requirements - simple write up and standard details <br />b. Detailed Phasing - Typical Section & Plan Sheet for every phase <br />11) Removal <br />12) Roadway_ - Plan & Profile <br />13) Grading Plan For Intersections - show limits of accessible path <br />14) Driveways {Specify One} <br />a. Plan & Profile for Each Driveway <br />b. Driveway Table <br />15) Drainage <br />a. Hydrologic Calculations <br />b. Drainage Area Map <br />c. Detention Basin, if Required <br />d. Plan and Profile <br />e. Laterals Profiles <br />f. Water Quality <br />16) Structural <br />17) Retaining Walls {Specify One} <br />a. Plan only - Typically 24" and smaller <br />b. Plan & Profile - Typically 24" and larger <br />18) Water Line {Specify One} <br />a. Plan only - Typically 8" Utility Project Only <br />b. Plan & Profile - Required for 12" and Larger. May want it for Full Depth Reconstruction or Drainage Projects <br />19) Wastewater Plan & Profile <br />20) Force Mann Plan & Profile <br />21) Reclaimed Water {Specify One} <br />a. Plan only - Typically 8" Utility Project Only <br />b. Plan & Profile - Required for 12" and Larger. May want it for Full Depth Reconstruction or Drainage Projects <br />22) Lift Station <br />a. Site Plan <br />b. Mechanical Plan <br />c. Structural Plan <br />e. Electrical Plan <br />f. Control Panel Schematic Diagram <br />g. RTU Schematic Diagram <br />23) Electrical —Underground {Specify One} (c.,&to„ry) <br />a. Plan only <br />01/19/2021 Page 14 of 43 3of5 <br />