My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-220 approving a contract with STV Inc. to provide on-call general engineering services for vaious projects in the amount of $900,000,00.
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-220 approving a contract with STV Inc. to provide on-call general engineering services for vaious projects in the amount of $900,000,00.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 2:12:48 PM
Creation date
12/11/2025 1:43:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-220
Date
11/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: E74COCFE-CO64-4OD2-A75B-E107999569F8 <br />e. Bid Form (Excel File) <br />f. Response Comments to 90 % Design <br />g. Engineering/CIP Plan Review Checklist <br />h. GIS Submittal Checklist <br />i. Construction Checklist <br />A. Meetings <br />1) Attend Pre Bid Meeting — Agenda prepared by COSM Staff <br />2) Answer Questions <br />3) Issues Addenda to Purchasing <br />B, Bid Review <br />1) Bid Tabulation of Submitted Bids <br />2) Reference check for bid qualification & Recommendation of Award <br />a. Check for Debarment and perform a background check (only required for Federal Funded Jobs) <br />b. Verify References of top 3 bidders <br />C, Deliverables <br />1) Letter of recommendation (add statement that debarment has been checked) <br />2) After Bid Opening - Conformed Plans (1 PDF, 1 DWG, 2-22"x34" Sets, 4-11 "xl7" Sets) <br />V. Colutructiori Phase <br />A, Assist with Constntction Tasks <br />1) Project Meetings <br />2) Attend Pre -Construction Meeting — Agenda prepared by COSM Staff <br />3) Submittal Review <br />4) Respond to Requests for Information/Modifications <br />5) Construction Observation (Site Visits Per Month_) — Typically Not Required <br />6) Construction Inspection — Typically Not Required <br />Notes: <br />7) Construction Monitoring As Required By THE or Others — Typically Not Required <br />Notes: <br />8) Pay Estimate Review <br />9) Review Change Orders <br />10) TDLR Inspection & Approval <br />11) Project Startup - Typically Lift Station Projects Only <br />Notes: <br />12) Attend Final Walls Through <br />B, Survey <br />1) Reset Monuments — Typically not required unless the design duration is long <br />2) Construction Layout For SMEU - Typically only enough detail for SMEU to move overhead in advance of CIP project. {Specify One} <br />a) Stake proposed poles and proposed features within 5' of poles <br />b) Stake proposed & existing ROW within project limits <br />C,I7eliverables <br />1) Site Visit Reports <br />2) Submittal Response & Log <br />3) RFI Response & Log <br />VI, PkedrdDrawillg Phase <br />A, 5uivey — See GIS Submittal Checklist For Items To Be Surveyed <br />1) Record Drawing Survey - After construction is completed, survey installed appurtenances and invert elevations <br />B, Plan Revisions <br />1) Update alignment on plans to reflects GPS data. <br />2) Update text on Profiles Inverts to reflect Record Drawing Survey. <br />C, Deliverables <br />1) Draft Drawings (1-22"x34" Set, 1-11"xl7" Set) <br />2) Final Drawings Per GIS Checklist <br />3) GIS Submittal Checklist & Additional Required Submittals <br />01/19/2021 Page 16 of 43 5of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.