Laserfiche WebLink
San Marcos Section 206 Aquatic Ecosystem Restoration Project <br />FEATURE <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />ESTIMATED COST <br />Aquatic Vegetation Restoration <br />Initial Aquatic Vegetation Clearing <br />Hr <br />2000 <br />$20/Hr <br />$40,000 ' <br />Offsite Aquatic Vegetation Disposal <br />Job <br />1 <br />$5,000/Job <br />$5,000 <br />Scuba Gear for Vegetation Divers <br />Ea <br />2 <br />$1,000/Ea <br />$2,000 <br />Scythes for Vegetation Divers <br />Ea <br />4 <br />$25/Ea <br />$100 <br />Dative Aquatic Plants & Planting <br />Ac <br />5 <br />$5,0001Ac <br />$25,000 <br />TOTAL <br />$72,100 <br />Sediment Removal <br />Vacuum Truck for Dredging <br />Ea <br />1 <br />$200,000 /Ea <br />$200,000 <br />Initial Silt Dredging <br />Hr <br />3432 <br />$20/Hr <br />$68,640 <br />Scuba Gear for Dredging Divers <br />Ea <br />2 <br />$1000/Ea <br />$2,000 <br />Offsite Silt Disposal <br />Job <br />1 <br />$5,000 /Job <br />$5,000 <br />Riverbank Widening Measure <br />Cy <br />1111 <br />$7/Cy <br />$7,777 <br />TOTAL <br />$283,417 <br />River Bank Stabilization <br />Riverbank Gabions in Selected Areas <br />Sf <br />7000 <br />$66/Sf <br />$462,000 <br />Rip Rap in Bridge Areas 12 to 24" <br />Cy <br />86 <br />$100/Cy <br />$8,600 <br />TOTAL <br />$4709600 <br />Grassland Restoration <br />Post and Cable Fencing <br />Lf <br />950 <br />S7/Lf <br />$6,650 <br />Grassland Planting <br />Ac <br />5.8 <br />$1,0001Ac <br />$5,800 <br />TOTAL <br />$12,450 <br />Riparian Corridor Restoration <br />Selective Clearing of Exotics <br />Ac <br />13 <br />$1000/Ac <br />$13,000 <br />Grad in Level jag/Shaping <br />Ac <br />5 <br />$1,000 /Ac <br />$5,000 <br />Debris Removal <br />Hr <br />40 <br />$155/Hr <br />$6,200 <br />Reforestation (use of 2" -caliper trees} <br />Ac <br />9.6 <br />$3000/Ac <br />$28,800 <br />Chain Link Fencing <br />Lf <br />1700 <br />$8/Lf <br />$13,600 <br />Top Soil <br />Cy <br />1 637 <br />$1 9,644 <br />Post & Cable Fencing <br />Lf <br />500 <br />-$12/Cy <br />$7/Lf <br />$3,500 <br />TOTAL <br />$89 744 <br />Wetland Enhancement & Creation <br />Water Control Structure <br />Ea <br />3 <br />$2,000 /Ea <br />$6,000 <br />Native Aquatic Plant Installation <br />Ac <br />3 <br />$5,0001Ac <br />$15,000 <br />Duck Boxes <br />Ea <br />10 <br />$50/Ea <br />$500 <br />LightClearing & Grubbing <br />Ac <br />3 <br />$800/Ac <br />$2,400 <br />Debris Removal <br />Hr <br />40 <br />$155/Hr <br />$6,200 <br />Excavation (6 ft ) <br />Cy <br />10,556 <br />$7/Cy <br />$73,892 <br />Gradin Levelin Sha in <br />Ac <br />3 <br />$1,000 /Ac <br />$3,000 <br />Berm Compaction 800' x 40' x 6' <br />Cy <br />7111 <br />$10/cy <br />$71,110 <br />Berm Turfing <br />Ac <br />0.2 <br />$2,7001Ac <br />$540 <br />Spillway Rip Ra 12 to 24" <br />C <br />300 <br />$100/Cy <br />$30,000 <br />Bald C ress Planting <br />Ac <br />1.5 <br />$1,000 /Ac <br />$1,500 <br />TOTAL <br />$Z10,14Z <br />Nutrient & Sediment Control <br />Gabion 2' x 150' x 3' <br />Ea <br />I <br />$8,000 /Ea <br />$8,000 <br />Gabion 2' x 10' x 3' <br />Ea <br />I <br />$5,0001Ea <br />$5,000 <br />Gabion (2' x 25' x 3' ) <br />Ea <br />1 <br />$6,0001Ea <br />$6,000 <br />Liner Material <br />Sf <br />6000 <br />$I/Sf <br />$6,000 <br />Native Aquatic Plant Installation <br />Ac <br />0.5 <br />$5,000 /Ac <br />$2,500 <br />Gradin Levelin Shaping____ <br />Ac <br />1.0 <br />$1,0001Ac <br />$1,000 <br />Excavation <br />Cy <br />225 <br />$7/Cy <br />$1,575 <br />Rip Rap (12 to 24" <br />Cy <br />2 <br />$10010 <br />$200 <br />TOTAL <br />$309275 <br />Monitoring <br />Sediment Monitorin 2 ears <br />Job <br />1 <br />$15,000/Job <br />$10,000 <br />Adaptive Management 2 ears <br />Job <br />1 <br />$15,0001Job <br />$10,000 <br />TOTAL <br />$30,D00 <br />