Laserfiche WebLink
Dam Removal & Modification <br />Dam Work boulders, concrete removal, ec!-.l <br />Job <br />1 <br />$1,000,000 /Jab <br />$1,004,000 <br />Abutment & Concrete Bag Removal <br />SF <br />1000 <br />$5/Sf <br />$5,000 <br />Mulch Area <br />cy <br />148 <br />$1410 <br />$2,072 <br />Post & Cable Fence <br />Lf <br />250 <br />$71Lf <br />$1,750 <br />--..-Top Soil <br />C <br />151 <br />$1210 <br />$1,812 <br />TOTAL <br />$1,0109634 <br />Debris & Hardpan Removal <br />Upper Concrete Gutter Removal <br />Sf <br />540 <br />$5/Sf <br />$2,700 <br />Geotextile Material <br />Sf <br />360 <br />$1/Sf <br />$360 <br />Grad in Levelin Sha in g <br />Ac <br />1.3 <br />$1,000 /Ac <br />$1,300 <br />Office /Boardwalk Area Concrete Wall Removal <br />Sf <br />2250 <br />$5/Sf <br />$11,250 <br />BuildinE Foundation Removal <br />Sf <br />3600 <br />$5/Sf <br />$189000 <br />Power Pole Removal <br />Ea <br />1 <br />$204 <br />$200 <br />Grist Mill Headwall Removal <br />Sf <br />1000 <br />$5/Sf <br />$5,000 <br />Grist Mill Turbine Removal <br />Job <br />1 <br />$1,0001Job <br />$1,000 <br />Grist Miscellaneous Concrete Removal <br />Sf <br />2500 <br />$51Sf <br />$12,500 <br />General Debris Removal <br />Sf <br />2000 <br />$5/Sf <br />$10,000 <br />TOTAL <br />$629310 <br />Miscellaneous Work <br />Culvert 1 Low Water Crossing Work <br />Job <br />1 <br />$15,0001Job <br />$15,000 <br />Top Soil to Cover Sewer Pie <br />cy <br />6 <br />$121C <br />$72 <br />TOTAL <br />$15,072 <br />CONSTRUCTION TOTAL <br />$292569744 <br />MONITORING TOTAL <br />$309000 <br />CONSTRUCTION COST ESTIMATE <br />$2,286,744 <br />